SEMI-CENTRALIZED WASTEWATER MANAGEMENT SYSTEM PLANNING AT RPTRA KOPI GANDARIA, PEKAYON, EAST JAKARTA

Pekayon, East Jakarta has now become a densely populated area. However, they do not have a good wastewater management system. Some people still dispose their wastewater into the drainage channel and other people have an on-site system (septic tank). But they never drain the septic tank and indicated...

Full description

Saved in:
Bibliographic Details
Main Author: Rachma Aulia, Maudy
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/63778
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:63778
spelling id-itb.:637782022-03-09T13:42:22ZSEMI-CENTRALIZED WASTEWATER MANAGEMENT SYSTEM PLANNING AT RPTRA KOPI GANDARIA, PEKAYON, EAST JAKARTA Rachma Aulia, Maudy Indonesia Final Project ABR, Aerobic Filter, Domestic Wastewater, Semi-Centralized WWTP, East Jakarta. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/63778 Pekayon, East Jakarta has now become a densely populated area. However, they do not have a good wastewater management system. Some people still dispose their wastewater into the drainage channel and other people have an on-site system (septic tank). But they never drain the septic tank and indicated to pollute the ground water. Therefore, it is necessary to plan a semi-centralized wastewater management system. This system is planned to serve several houses in Pekayon. The wastewater treatment plant (WWTP) is located at RPTRA Kopi Gandaria. There are 3 alternatives each for the collection pipelines and wastewater treatment plant (WWTP). The selected alternatives were chosen by Analytical Hierarchy Process (AHP). Total population that served by this system is 2,642 people. The pipelines are planned to use a shallow sewer system with diameter ranging from 100 – 200 mm. This pipelines also planned to use PVC. Furthermore, these pipelines using a gravity and pressurized flow. The WWTP is carried out in 2 stages which in stage 1 the capacity is 60.69 m3/day and in stage 2 is 156.19 m3/day. Selected treatment plant that used in WWTP consist of bar screen, equalization basin, anaerobic baffled reactor, aerobic filter, and disinfection basin which will then flow to the drainage channel. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Pekayon, East Jakarta has now become a densely populated area. However, they do not have a good wastewater management system. Some people still dispose their wastewater into the drainage channel and other people have an on-site system (septic tank). But they never drain the septic tank and indicated to pollute the ground water. Therefore, it is necessary to plan a semi-centralized wastewater management system. This system is planned to serve several houses in Pekayon. The wastewater treatment plant (WWTP) is located at RPTRA Kopi Gandaria. There are 3 alternatives each for the collection pipelines and wastewater treatment plant (WWTP). The selected alternatives were chosen by Analytical Hierarchy Process (AHP). Total population that served by this system is 2,642 people. The pipelines are planned to use a shallow sewer system with diameter ranging from 100 – 200 mm. This pipelines also planned to use PVC. Furthermore, these pipelines using a gravity and pressurized flow. The WWTP is carried out in 2 stages which in stage 1 the capacity is 60.69 m3/day and in stage 2 is 156.19 m3/day. Selected treatment plant that used in WWTP consist of bar screen, equalization basin, anaerobic baffled reactor, aerobic filter, and disinfection basin which will then flow to the drainage channel.
format Final Project
author Rachma Aulia, Maudy
spellingShingle Rachma Aulia, Maudy
SEMI-CENTRALIZED WASTEWATER MANAGEMENT SYSTEM PLANNING AT RPTRA KOPI GANDARIA, PEKAYON, EAST JAKARTA
author_facet Rachma Aulia, Maudy
author_sort Rachma Aulia, Maudy
title SEMI-CENTRALIZED WASTEWATER MANAGEMENT SYSTEM PLANNING AT RPTRA KOPI GANDARIA, PEKAYON, EAST JAKARTA
title_short SEMI-CENTRALIZED WASTEWATER MANAGEMENT SYSTEM PLANNING AT RPTRA KOPI GANDARIA, PEKAYON, EAST JAKARTA
title_full SEMI-CENTRALIZED WASTEWATER MANAGEMENT SYSTEM PLANNING AT RPTRA KOPI GANDARIA, PEKAYON, EAST JAKARTA
title_fullStr SEMI-CENTRALIZED WASTEWATER MANAGEMENT SYSTEM PLANNING AT RPTRA KOPI GANDARIA, PEKAYON, EAST JAKARTA
title_full_unstemmed SEMI-CENTRALIZED WASTEWATER MANAGEMENT SYSTEM PLANNING AT RPTRA KOPI GANDARIA, PEKAYON, EAST JAKARTA
title_sort semi-centralized wastewater management system planning at rptra kopi gandaria, pekayon, east jakarta
url https://digilib.itb.ac.id/gdl/view/63778
_version_ 1822004388507418624