PLANNING AND DESIGN OF SEA SIDE TPS – KALIANAK CORRIDOR RAILWAY STEEL TRUSS BRIDGE CONSTRUCTION

TPS – Kalianak Railway bridge is a part of new transportation mode planned to facilitate the transportation activity of logistics from and to Tanjung Perak harbor. In order to objectify the bridge promptly as designed, a planning of construction method and management is required. The planning inv...

Full description

Saved in:
Bibliographic Details
Main Author: Miranda Shandy Rivienna, Siti
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/64163
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:64163
spelling id-itb.:641632022-04-05T14:45:47ZPLANNING AND DESIGN OF SEA SIDE TPS – KALIANAK CORRIDOR RAILWAY STEEL TRUSS BRIDGE CONSTRUCTION Miranda Shandy Rivienna, Siti Indonesia Final Project steel truss arch bridge, cantilever launch, bridge construction on the sea, construction method, project scheduling, resource enumeration, cost estimation INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/64163 TPS – Kalianak Railway bridge is a part of new transportation mode planned to facilitate the transportation activity of logistics from and to Tanjung Perak harbor. In order to objectify the bridge promptly as designed, a planning of construction method and management is required. The planning involves determining effective construction methods, project scheduling, and project cost estimation to achieve the main objectives of the planning ie, timely, cost, and quality. The construction begins with preparatory work consists of field cleaning, surveying, temporary facilities construction, and mobilization. The bridge’s substructure works is done afterwards by doing earthwork, foundation work, and pile cap. Next is the superstructure works including construction of pier, bearing pads, and steel truss bridge by cantilever launch method. The latter work is the railway track which consists of concrete pads, steel rail tracks and rail joints. All work is done in accordance to the planned sequence and zone. Project schedule is modeled in Microsoft Project resulting the project duration of 238 working days. Cost estimation of engineer’s estimate is done with resource enumeration method. This project is estimated to cost Rp 467.572.450.396 or Rp 190.070.102 per meter. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description TPS – Kalianak Railway bridge is a part of new transportation mode planned to facilitate the transportation activity of logistics from and to Tanjung Perak harbor. In order to objectify the bridge promptly as designed, a planning of construction method and management is required. The planning involves determining effective construction methods, project scheduling, and project cost estimation to achieve the main objectives of the planning ie, timely, cost, and quality. The construction begins with preparatory work consists of field cleaning, surveying, temporary facilities construction, and mobilization. The bridge’s substructure works is done afterwards by doing earthwork, foundation work, and pile cap. Next is the superstructure works including construction of pier, bearing pads, and steel truss bridge by cantilever launch method. The latter work is the railway track which consists of concrete pads, steel rail tracks and rail joints. All work is done in accordance to the planned sequence and zone. Project schedule is modeled in Microsoft Project resulting the project duration of 238 working days. Cost estimation of engineer’s estimate is done with resource enumeration method. This project is estimated to cost Rp 467.572.450.396 or Rp 190.070.102 per meter.
format Final Project
author Miranda Shandy Rivienna, Siti
spellingShingle Miranda Shandy Rivienna, Siti
PLANNING AND DESIGN OF SEA SIDE TPS – KALIANAK CORRIDOR RAILWAY STEEL TRUSS BRIDGE CONSTRUCTION
author_facet Miranda Shandy Rivienna, Siti
author_sort Miranda Shandy Rivienna, Siti
title PLANNING AND DESIGN OF SEA SIDE TPS – KALIANAK CORRIDOR RAILWAY STEEL TRUSS BRIDGE CONSTRUCTION
title_short PLANNING AND DESIGN OF SEA SIDE TPS – KALIANAK CORRIDOR RAILWAY STEEL TRUSS BRIDGE CONSTRUCTION
title_full PLANNING AND DESIGN OF SEA SIDE TPS – KALIANAK CORRIDOR RAILWAY STEEL TRUSS BRIDGE CONSTRUCTION
title_fullStr PLANNING AND DESIGN OF SEA SIDE TPS – KALIANAK CORRIDOR RAILWAY STEEL TRUSS BRIDGE CONSTRUCTION
title_full_unstemmed PLANNING AND DESIGN OF SEA SIDE TPS – KALIANAK CORRIDOR RAILWAY STEEL TRUSS BRIDGE CONSTRUCTION
title_sort planning and design of sea side tps – kalianak corridor railway steel truss bridge construction
url https://digilib.itb.ac.id/gdl/view/64163
_version_ 1822932361081257984