DESAIN SUMUR-SUMUR MENGGUNAKAN ELECTRIC SUBMERSIBLE PUMP DALAM MENINGKATKAN PRODUKSI DAN PENGOPTIMALAN WAKTU WORKOVER PADA LAPANGAN X
Hydrocarbons in a reservoir flows naturally to the surface at the start of production. Along with oil production, reservoir pressure will drop as a result of the reduction of the volum of the fluid reservoir. This resulted in the production of pressure drop for a given field will go down until it re...
Saved in:
Main Author: | Budiharto, Trisno |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/64207 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ESTIMASI WATER CUT DARI KANDIDAT INTERVAL PERFORASI UNTUK SUMUR - SUMUR WORKOVER - WELL SERVICE
by: Emilia Sutiauwan, Debby -
RE-DESAIN DAN EVALUASI KINERJA POMPA SUBMERSIBLE LISTRIK DI SUMUR BER-GAS EKSTRIM: STUDI KASUS DI LAPANGAN
by: Rafi Munthe, Albar -
PERANCANGAN INSTALASI SISTEM POMPA ELECTRIC SUBMERSIBLE(ESP) PADA SUMUR MINYAK BUMI.
by: Esatri Barus, Alwendi -
PERANCANGAN SISTEM ELECTRIC SUBMERSIBLE PUMP (ESP) DENGAN ANALISIS ALIRAN MULTI FASA PADA SUMUR MINYAK PETROCHINA INTERNATIONAL BERMUDA LTD.
by: Kristian Wijaya, Fx -
OPTIMUM DESAIN INJEKSI GAS LIFT UNTUK MENINGKATKAN PERFORMA SUMUR X
by: Umaryono, Itto