The Laksmana offshore area is one of the oil field area under Sumatera field. The production from the Laksmana offshore area is 750 BOPD (Barrel Oil per Day). The instrumentation system in Laksmana Offshore area plays a vital role in the production process since instrument equipment controls the...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/64425 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | The Laksmana offshore area is one of the oil field area under Sumatera field. The production
from the Laksmana offshore area is 750 BOPD (Barrel Oil per Day). The instrumentation
system in Laksmana Offshore area plays a vital role in the production process since instrument
equipment controls the Fluid Flow, level, and pressure.
Based on the data collected from January 7th, 2020, to December 6th, 2020, there were 13
unplanned shutdowns caused by instrumentation system failures. This instrumentation failure
can be grouped into 3 major categories: Air supply compressor Failure, Instrumentation Valve
Problems, and Instrument equipment malfunctions. By stratifying the problem using a Pareto
diagram, it was found that the problem of air compressor failure is the most significant cause
that has the biggest impact. To find the rootcause and the most dominant factor of the problem,
the researcher carried out Fishbone diagrams and Failure Mode Effect Analysis (FMEA)
combined with Pareto diagrams. The result is that the Company does not yet have methods and
facilities to monitor the condition of the compressor in real time, so it is difficult to analyze
and know the early signs of air compressor failure.
By using the value-focused thinking method, the researcher and the team in the focus group
discussion develop alternatives that can be implemented to achieve the fundamental objectives
that have been set. There are 4 alternative solutions can be used to solve this problem. The first
alternative is installing the HMI(Human Machine Interface/SCADA) system. The second
alternative is purchase and use the S551 Data Logger. The third alternative is the assembly of
own innovation tools made by the Laksmana's worker, and the last is to appoint extra personnel
for daily monitoring of the compressor. This research will use the Analytical Hierarchy Process
(AHP) and Simple Multi Attribute Rating Technique (SMART) methods to determine the best
solution. Based on the results of the interviews obtained 3 criteria in the value tree. The criteria
are in the form of Cost, Benefit, and Risk. The Cost criteria has 1 sub-criteria, namely the
installation cost, the benefit criterion has 2 sub-criteria consisting of installation time &
accessibility. And the last criterion is risk. It has 2 sub-criteria: the risk of work installation and
the risk of human error.The calculations using the AHP and SMART methods obtained the
same results. The own innovation tool become the best solution. |
---|