USULAN PERBAIKAN EFISIENSI SISTEM PRODUKSI WIRE HARNESSING DI PT DIRGANTARA INDONESIA DENGAN PENDEKATAN WASTE ASSESSTMENT MODEL

PT Dirgantara Indonesia is Indonesian Aircraft Industries that produce various types of aircraft. At the end of 2020, there is a gap with 50% percentages between actual workload and production capacity. Therefore, the objective of this study is to increase the efficiency by reducing the number of...

Full description

Saved in:
Bibliographic Details
Main Author: Bonar Silaban, Jeremy
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/64635
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:64635
spelling id-itb.:646352022-05-30T15:49:37ZUSULAN PERBAIKAN EFISIENSI SISTEM PRODUKSI WIRE HARNESSING DI PT DIRGANTARA INDONESIA DENGAN PENDEKATAN WASTE ASSESSTMENT MODEL Bonar Silaban, Jeremy Indonesia Final Project DMAIC, WAM, Lean Manufacturing, Harness. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/64635 PT Dirgantara Indonesia is Indonesian Aircraft Industries that produce various types of aircraft. At the end of 2020, there is a gap with 50% percentages between actual workload and production capacity. Therefore, the objective of this study is to increase the efficiency by reducing the number of waste that identified in harness shop using Define, Measure, Analyze, Improve, and Control (DMAIC) approach with lean principles. In the define phase, implementation of the project is set in harness shop. In the measure phase, the results of waste identified in harness shop are as follows, inventory waste with 21,46% value and defects waste with 18,91% value using Waste Assesstment Model. In the analyze phase, by using pareto chart, the cause of inventory and defects waste are further analyzed using cause effect diagram. In improve phase, there are 2 alternatives solution to increase efficiency in harness shop which are the usage of projector to solve defects waste in connecting area and also the improvement of information flow that happen in harness shop. In control phase, risks are identified to the solutions given which are preparation of the human labor in harness shop to use new technology and data transformation and collection to support improvement in information system. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Dirgantara Indonesia is Indonesian Aircraft Industries that produce various types of aircraft. At the end of 2020, there is a gap with 50% percentages between actual workload and production capacity. Therefore, the objective of this study is to increase the efficiency by reducing the number of waste that identified in harness shop using Define, Measure, Analyze, Improve, and Control (DMAIC) approach with lean principles. In the define phase, implementation of the project is set in harness shop. In the measure phase, the results of waste identified in harness shop are as follows, inventory waste with 21,46% value and defects waste with 18,91% value using Waste Assesstment Model. In the analyze phase, by using pareto chart, the cause of inventory and defects waste are further analyzed using cause effect diagram. In improve phase, there are 2 alternatives solution to increase efficiency in harness shop which are the usage of projector to solve defects waste in connecting area and also the improvement of information flow that happen in harness shop. In control phase, risks are identified to the solutions given which are preparation of the human labor in harness shop to use new technology and data transformation and collection to support improvement in information system.
format Final Project
author Bonar Silaban, Jeremy
spellingShingle Bonar Silaban, Jeremy
USULAN PERBAIKAN EFISIENSI SISTEM PRODUKSI WIRE HARNESSING DI PT DIRGANTARA INDONESIA DENGAN PENDEKATAN WASTE ASSESSTMENT MODEL
author_facet Bonar Silaban, Jeremy
author_sort Bonar Silaban, Jeremy
title USULAN PERBAIKAN EFISIENSI SISTEM PRODUKSI WIRE HARNESSING DI PT DIRGANTARA INDONESIA DENGAN PENDEKATAN WASTE ASSESSTMENT MODEL
title_short USULAN PERBAIKAN EFISIENSI SISTEM PRODUKSI WIRE HARNESSING DI PT DIRGANTARA INDONESIA DENGAN PENDEKATAN WASTE ASSESSTMENT MODEL
title_full USULAN PERBAIKAN EFISIENSI SISTEM PRODUKSI WIRE HARNESSING DI PT DIRGANTARA INDONESIA DENGAN PENDEKATAN WASTE ASSESSTMENT MODEL
title_fullStr USULAN PERBAIKAN EFISIENSI SISTEM PRODUKSI WIRE HARNESSING DI PT DIRGANTARA INDONESIA DENGAN PENDEKATAN WASTE ASSESSTMENT MODEL
title_full_unstemmed USULAN PERBAIKAN EFISIENSI SISTEM PRODUKSI WIRE HARNESSING DI PT DIRGANTARA INDONESIA DENGAN PENDEKATAN WASTE ASSESSTMENT MODEL
title_sort usulan perbaikan efisiensi sistem produksi wire harnessing di pt dirgantara indonesia dengan pendekatan waste assesstment model
url https://digilib.itb.ac.id/gdl/view/64635
_version_ 1822277068970262528