KAJIAN DAMPAK PENDANAAN KARBON DALAM PEMBANGUNAN DAN OPERASIONAL PEMBANGKIT LISTRIK TENAGA UAP (PLTU) BERBAHAN BAKAR BATUBARA DENGAN TEKNOLOGI ULTRASUPERCRITICAL DI INDONESIA

Indonesia today facing the lack of electricity condition. Acceleration program to develop 35.000 MW of electricity implemented by government yields problems such as very large investment needs and an increase of carbon emission. PT. PLN (Persero) planned to built 1.000 MW coal power plant using Ultr...

Full description

Saved in:
Bibliographic Details
Main Author: Restu Adiati, Ririn
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/64860
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia