KAJIAN DAMPAK PENDANAAN KARBON DALAM PEMBANGUNAN DAN OPERASIONAL PEMBANGKIT LISTRIK TENAGA UAP (PLTU) BERBAHAN BAKAR BATUBARA DENGAN TEKNOLOGI ULTRASUPERCRITICAL DI INDONESIA

Indonesia today facing the lack of electricity condition. Acceleration program to develop 35.000 MW of electricity implemented by government yields problems such as very large investment needs and an increase of carbon emission. PT. PLN (Persero) planned to built 1.000 MW coal power plant using Ultr...

Full description

Saved in:
Bibliographic Details
Main Author: Restu Adiati, Ririn
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/64860
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:64860
spelling id-itb.:648602022-06-14T11:30:47ZKAJIAN DAMPAK PENDANAAN KARBON DALAM PEMBANGUNAN DAN OPERASIONAL PEMBANGKIT LISTRIK TENAGA UAP (PLTU) BERBAHAN BAKAR BATUBARA DENGAN TEKNOLOGI ULTRASUPERCRITICAL DI INDONESIA Restu Adiati, Ririn Indonesia Theses carbon funding, CO2 emission, steam coal power plant, ultrasupercritical INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/64860 Indonesia today facing the lack of electricity condition. Acceleration program to develop 35.000 MW of electricity implemented by government yields problems such as very large investment needs and an increase of carbon emission. PT. PLN (Persero) planned to built 1.000 MW coal power plant using Ultra-supercritical (USC) technology. This technology generates better efficiency and lower carbon emission in coal power plant, better than Subcritical (Sub) technology which is currently used in Indonesia. Carbon emission reduction produced by USC will be used to gain carbon funding. Prediction of potensial income from carbon funding required calculation of emission from the existing power plant. The difference between emission from USC and Sub technology indicated the number of carbon emission reduction. From these calculations, can be analysed effect of carbon financing for USC coal power plant in Indonesia. CO2 emission from existing power plant was calculated based on fuel consumption data published by PT. PLN (Persero). A decrease of CO2 emission was calculated by IPCC 2006 methodology. The best mechanism was decided by Net Present Value (NPV) method and comparison of carbon fund for each electricity production unit. Effect analysis was done by NPV and Benefit Cost Ratio (BCR) Methods. Steam coal power plants that are currently used in Indonesia generate CO2 emission as 0.00086 Gg CO2/MWh electricity. Implemetation of USC technology for 6 plant that will be built in Indonesia will produce CO2 reduction as 13,706 Gg CO2. JCM which 100% construction cost was covered by Japanesse Government was the most profitable mechanism for Indonesia. Carbon funding could not cover all of the cost generated by USC technology, but it made a positive impact in the economy condition of USC steam coal power plant development. Through carbon funding, USC technology was economical to be developed. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Indonesia today facing the lack of electricity condition. Acceleration program to develop 35.000 MW of electricity implemented by government yields problems such as very large investment needs and an increase of carbon emission. PT. PLN (Persero) planned to built 1.000 MW coal power plant using Ultra-supercritical (USC) technology. This technology generates better efficiency and lower carbon emission in coal power plant, better than Subcritical (Sub) technology which is currently used in Indonesia. Carbon emission reduction produced by USC will be used to gain carbon funding. Prediction of potensial income from carbon funding required calculation of emission from the existing power plant. The difference between emission from USC and Sub technology indicated the number of carbon emission reduction. From these calculations, can be analysed effect of carbon financing for USC coal power plant in Indonesia. CO2 emission from existing power plant was calculated based on fuel consumption data published by PT. PLN (Persero). A decrease of CO2 emission was calculated by IPCC 2006 methodology. The best mechanism was decided by Net Present Value (NPV) method and comparison of carbon fund for each electricity production unit. Effect analysis was done by NPV and Benefit Cost Ratio (BCR) Methods. Steam coal power plants that are currently used in Indonesia generate CO2 emission as 0.00086 Gg CO2/MWh electricity. Implemetation of USC technology for 6 plant that will be built in Indonesia will produce CO2 reduction as 13,706 Gg CO2. JCM which 100% construction cost was covered by Japanesse Government was the most profitable mechanism for Indonesia. Carbon funding could not cover all of the cost generated by USC technology, but it made a positive impact in the economy condition of USC steam coal power plant development. Through carbon funding, USC technology was economical to be developed.
format Theses
author Restu Adiati, Ririn
spellingShingle Restu Adiati, Ririn
KAJIAN DAMPAK PENDANAAN KARBON DALAM PEMBANGUNAN DAN OPERASIONAL PEMBANGKIT LISTRIK TENAGA UAP (PLTU) BERBAHAN BAKAR BATUBARA DENGAN TEKNOLOGI ULTRASUPERCRITICAL DI INDONESIA
author_facet Restu Adiati, Ririn
author_sort Restu Adiati, Ririn
title KAJIAN DAMPAK PENDANAAN KARBON DALAM PEMBANGUNAN DAN OPERASIONAL PEMBANGKIT LISTRIK TENAGA UAP (PLTU) BERBAHAN BAKAR BATUBARA DENGAN TEKNOLOGI ULTRASUPERCRITICAL DI INDONESIA
title_short KAJIAN DAMPAK PENDANAAN KARBON DALAM PEMBANGUNAN DAN OPERASIONAL PEMBANGKIT LISTRIK TENAGA UAP (PLTU) BERBAHAN BAKAR BATUBARA DENGAN TEKNOLOGI ULTRASUPERCRITICAL DI INDONESIA
title_full KAJIAN DAMPAK PENDANAAN KARBON DALAM PEMBANGUNAN DAN OPERASIONAL PEMBANGKIT LISTRIK TENAGA UAP (PLTU) BERBAHAN BAKAR BATUBARA DENGAN TEKNOLOGI ULTRASUPERCRITICAL DI INDONESIA
title_fullStr KAJIAN DAMPAK PENDANAAN KARBON DALAM PEMBANGUNAN DAN OPERASIONAL PEMBANGKIT LISTRIK TENAGA UAP (PLTU) BERBAHAN BAKAR BATUBARA DENGAN TEKNOLOGI ULTRASUPERCRITICAL DI INDONESIA
title_full_unstemmed KAJIAN DAMPAK PENDANAAN KARBON DALAM PEMBANGUNAN DAN OPERASIONAL PEMBANGKIT LISTRIK TENAGA UAP (PLTU) BERBAHAN BAKAR BATUBARA DENGAN TEKNOLOGI ULTRASUPERCRITICAL DI INDONESIA
title_sort kajian dampak pendanaan karbon dalam pembangunan dan operasional pembangkit listrik tenaga uap (pltu) berbahan bakar batubara dengan teknologi ultrasupercritical di indonesia
url https://digilib.itb.ac.id/gdl/view/64860
_version_ 1822277132786597888