DETERMINING THE COMBINATION OF QUANTITY AND CAPACITY OF GAS COMPRESSORS FOR INCREASING GAS PRODUCTION AT THE GATHERING STATION OF PT PERTAMINA EP

In the oil and gas production process, one of the oil and gas lifting techniques is using the gas lift method. With this gas lift method, a natural gas compression system is needed to send gas back into the bowels of the earth. It is often found that the selection of compression equipment provided d...

Full description

Saved in:
Bibliographic Details
Main Author: Tambunan, Renold
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/65347
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:65347
spelling id-itb.:653472022-06-22T13:13:35ZDETERMINING THE COMBINATION OF QUANTITY AND CAPACITY OF GAS COMPRESSORS FOR INCREASING GAS PRODUCTION AT THE GATHERING STATION OF PT PERTAMINA EP Tambunan, Renold Indonesia Theses Multi Criteria, Gas Lift Compressor, Hierarchical Analytical Process, Quantitative, Qualitative. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/65347 In the oil and gas production process, one of the oil and gas lifting techniques is using the gas lift method. With this gas lift method, a natural gas compression system is needed to send gas back into the bowels of the earth. It is often found that the selection of compression equipment provided does not consider many aspects and only considers the cost aspect. This study aims to plan a decision-making model in determining the configuration or combination of how many compressors and compressor flow capacities are with several criteria, namely cost, Operational and Maintenance, the situation of existing facilities, and considering how much gas capacity can be flowed as well as alternative capacity configurations. used are 1 x 100% Capacity, 2 x 50% Capacity and 5 x 20% Capacity. With these several criteria, the method used is the Analytical Hierarchy Process (AHP). This method can facilitate input in the form of quantitative and qualitative. All the results of the discussion and the questionnaire were entered into the formula so that the normalized scores were obtained. The calculation is done online which was developed by Klaus D Goepel (2018) in processing data, so that the configuration for the compressor is obtained. For the capacity configuration according to the calculation results, priority is 2x50% Capacity where the alternative has the highest weight value in 6 of the 9 sub-criteria. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description In the oil and gas production process, one of the oil and gas lifting techniques is using the gas lift method. With this gas lift method, a natural gas compression system is needed to send gas back into the bowels of the earth. It is often found that the selection of compression equipment provided does not consider many aspects and only considers the cost aspect. This study aims to plan a decision-making model in determining the configuration or combination of how many compressors and compressor flow capacities are with several criteria, namely cost, Operational and Maintenance, the situation of existing facilities, and considering how much gas capacity can be flowed as well as alternative capacity configurations. used are 1 x 100% Capacity, 2 x 50% Capacity and 5 x 20% Capacity. With these several criteria, the method used is the Analytical Hierarchy Process (AHP). This method can facilitate input in the form of quantitative and qualitative. All the results of the discussion and the questionnaire were entered into the formula so that the normalized scores were obtained. The calculation is done online which was developed by Klaus D Goepel (2018) in processing data, so that the configuration for the compressor is obtained. For the capacity configuration according to the calculation results, priority is 2x50% Capacity where the alternative has the highest weight value in 6 of the 9 sub-criteria.
format Theses
author Tambunan, Renold
spellingShingle Tambunan, Renold
DETERMINING THE COMBINATION OF QUANTITY AND CAPACITY OF GAS COMPRESSORS FOR INCREASING GAS PRODUCTION AT THE GATHERING STATION OF PT PERTAMINA EP
author_facet Tambunan, Renold
author_sort Tambunan, Renold
title DETERMINING THE COMBINATION OF QUANTITY AND CAPACITY OF GAS COMPRESSORS FOR INCREASING GAS PRODUCTION AT THE GATHERING STATION OF PT PERTAMINA EP
title_short DETERMINING THE COMBINATION OF QUANTITY AND CAPACITY OF GAS COMPRESSORS FOR INCREASING GAS PRODUCTION AT THE GATHERING STATION OF PT PERTAMINA EP
title_full DETERMINING THE COMBINATION OF QUANTITY AND CAPACITY OF GAS COMPRESSORS FOR INCREASING GAS PRODUCTION AT THE GATHERING STATION OF PT PERTAMINA EP
title_fullStr DETERMINING THE COMBINATION OF QUANTITY AND CAPACITY OF GAS COMPRESSORS FOR INCREASING GAS PRODUCTION AT THE GATHERING STATION OF PT PERTAMINA EP
title_full_unstemmed DETERMINING THE COMBINATION OF QUANTITY AND CAPACITY OF GAS COMPRESSORS FOR INCREASING GAS PRODUCTION AT THE GATHERING STATION OF PT PERTAMINA EP
title_sort determining the combination of quantity and capacity of gas compressors for increasing gas production at the gathering station of pt pertamina ep
url https://digilib.itb.ac.id/gdl/view/65347
_version_ 1822932715354193920