DETERMINING THE COMBINATION OF QUANTITY AND CAPACITY OF GAS COMPRESSORS FOR INCREASING GAS PRODUCTION AT THE GATHERING STATION OF PT PERTAMINA EP
In the oil and gas production process, one of the oil and gas lifting techniques is using the gas lift method. With this gas lift method, a natural gas compression system is needed to send gas back into the bowels of the earth. It is often found that the selection of compression equipment provided d...
Saved in:
Main Author: | Tambunan, Renold |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/65347 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF COMPRESSOR REQUIREMENT AND PIPE SIZE SELECTION IN GAS COMPRESSOR STATION CASE STUDY: GAS COMPRESSOR STATION IN MERBAU
by: RAHIM BIMA DWI PUTRA (NIM : 13104138); Dosen Pembimbing I : Prof. Dr. Ir. IGN Wiratmaja Puja ; , NUR -
Piping System Stress Analysis on Gas Compressor Station (Case Study: Gas Compressor Station at Pondok Tengah)
by: BANI PERWIRA (NIM 13104160), YOSEPHUS -
MAXIMIZING COMPANYâS REVENUE THROUGH OPTIMIZATION OF GAS SALES AT PT. PERTAMINA EP
by: Preharsa, Data -
OPTIMIZATION OF PIPE DIAMETER AND TOPOGRAPHICAL COMPRESSOR GAS TRANSPORTATION SYSTEM FOR THE INCREASED DEMAND FOR GAS
by: TAMPATI FAHDINAR (NIM : 22208306); Pembimbing : Dr. Ir. Arsegianto, M.sc., RICKO -
RISK MANAGEMENT IMPLEMENTATION FOR GAS PRODUCTION PROJECT AT KSO PERTAMINA EP - TECHWIN BENAKAT TIMUR
by: HARYANTO PURWADI (NIM 29114597), RIO