THE DEVELOPMENT OF WATER TREATMENT PLANT (WTP) I AND II OF PDAM WAY RILAU BANDAR LAMPUNG CITY BY NEW WTP CONSTRUCTION PLANNING

PDAM Way Rilau is the only water resource management company in Bandar Lampung. The increase in population, together with the increasing demand for clean water supply, has resulted in two existing installations operating beyond their capacity. This has become the driving force for the development of...

Full description

Saved in:
Bibliographic Details
Main Author: Eka Saputri, Ramandini
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/65472
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:65472
spelling id-itb.:654722022-06-23T12:57:26ZTHE DEVELOPMENT OF WATER TREATMENT PLANT (WTP) I AND II OF PDAM WAY RILAU BANDAR LAMPUNG CITY BY NEW WTP CONSTRUCTION PLANNING Eka Saputri, Ramandini Indonesia Final Project Clean water, Development, Water Treatment Plant (WTP) INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/65472 PDAM Way Rilau is the only water resource management company in Bandar Lampung. The increase in population, together with the increasing demand for clean water supply, has resulted in two existing installations operating beyond their capacity. This has become the driving force for the development of Water Treatment Plant (WTP) I and II of PDAM Way Rilau with the planning for the construction of a new WTP. Determining the most optimal alternative to the new WTP configuration to remove contaminants is carried out using the Analytical Hierarchy Process (AHP) method, with a selected alternative unit consisting of coagulation units using static mixers, clariflocculators, rapid sand filtrations, and disinfection using chlorine gas injection. The total minimum land area required for the new WTP is 1.7 hectares with an initial investment cost of Rp 45,471,064,000,- for the first development period and Rp 59,083,591,000,- for the second development period. The operational and maintenance costs for the first period is estimated at Rp 17,773,935,000,-. As for the second period, the amount is Rp. 12,462,510,000,-. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PDAM Way Rilau is the only water resource management company in Bandar Lampung. The increase in population, together with the increasing demand for clean water supply, has resulted in two existing installations operating beyond their capacity. This has become the driving force for the development of Water Treatment Plant (WTP) I and II of PDAM Way Rilau with the planning for the construction of a new WTP. Determining the most optimal alternative to the new WTP configuration to remove contaminants is carried out using the Analytical Hierarchy Process (AHP) method, with a selected alternative unit consisting of coagulation units using static mixers, clariflocculators, rapid sand filtrations, and disinfection using chlorine gas injection. The total minimum land area required for the new WTP is 1.7 hectares with an initial investment cost of Rp 45,471,064,000,- for the first development period and Rp 59,083,591,000,- for the second development period. The operational and maintenance costs for the first period is estimated at Rp 17,773,935,000,-. As for the second period, the amount is Rp. 12,462,510,000,-.
format Final Project
author Eka Saputri, Ramandini
spellingShingle Eka Saputri, Ramandini
THE DEVELOPMENT OF WATER TREATMENT PLANT (WTP) I AND II OF PDAM WAY RILAU BANDAR LAMPUNG CITY BY NEW WTP CONSTRUCTION PLANNING
author_facet Eka Saputri, Ramandini
author_sort Eka Saputri, Ramandini
title THE DEVELOPMENT OF WATER TREATMENT PLANT (WTP) I AND II OF PDAM WAY RILAU BANDAR LAMPUNG CITY BY NEW WTP CONSTRUCTION PLANNING
title_short THE DEVELOPMENT OF WATER TREATMENT PLANT (WTP) I AND II OF PDAM WAY RILAU BANDAR LAMPUNG CITY BY NEW WTP CONSTRUCTION PLANNING
title_full THE DEVELOPMENT OF WATER TREATMENT PLANT (WTP) I AND II OF PDAM WAY RILAU BANDAR LAMPUNG CITY BY NEW WTP CONSTRUCTION PLANNING
title_fullStr THE DEVELOPMENT OF WATER TREATMENT PLANT (WTP) I AND II OF PDAM WAY RILAU BANDAR LAMPUNG CITY BY NEW WTP CONSTRUCTION PLANNING
title_full_unstemmed THE DEVELOPMENT OF WATER TREATMENT PLANT (WTP) I AND II OF PDAM WAY RILAU BANDAR LAMPUNG CITY BY NEW WTP CONSTRUCTION PLANNING
title_sort development of water treatment plant (wtp) i and ii of pdam way rilau bandar lampung city by new wtp construction planning
url https://digilib.itb.ac.id/gdl/view/65472
_version_ 1822277329270865920