PERANCANGAN PROTOTIPE SISTEM PENDUKUNG KEPUTUSAN RANCANGAN FASILITAS DAN TATA TATA LETAK PROYEK KONSTRUKSI STUDI KASUS: PROYEK EPC TERMINAL LPG REFRIGERATED PT X
PT. X is one of the Indonesian State-Owned Enterprises (BUMN) engaged in the construction sector. In designing the layout of construction project storage facilities, PT. X implemented the methodology developed by Lokananta in 2018. The implementation of the process and use of the methodology crea...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/65577 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |