PERANCANGAN PROTOTIPE SISTEM PENDUKUNG KEPUTUSAN RANCANGAN FASILITAS DAN TATA TATA LETAK PROYEK KONSTRUKSI STUDI KASUS: PROYEK EPC TERMINAL LPG REFRIGERATED PT X
PT. X is one of the Indonesian State-Owned Enterprises (BUMN) engaged in the construction sector. In designing the layout of construction project storage facilities, PT. X implemented the methodology developed by Lokananta in 2018. The implementation of the process and use of the methodology crea...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/65577 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | PT. X is one of the Indonesian State-Owned Enterprises (BUMN) engaged in the
construction sector. In designing the layout of construction project storage
facilities, PT. X implemented the methodology developed by Lokananta in 2018.
The implementation of the process and use of the methodology created new
problems for the company, namely design errors due to calculation errors caused
by employees that using the methodology and the output of the tools used did not
match the design needs. Therefore, a decision support system is needed to optimize
the implementation and use of the Lokananta construction project storage facility
layout design methodology.
The support system design stages are methodological studies, identification of
decision-making needs and flow chart mapping, identification of decision support
system needs, and the process of designing components of a decision support
system. After the conceptual design, the design and construction of a decision
support system prototype were carried out using Microsoft Excel and Python
software. The prototype decision support system that has been built is then
validated and verified to ensure the decision support system meets the needs of the
decision support system and does not have problems in its operation and use.
The trial of the decision support system was carried out using the LPG Refrigerated
terminal EPC project scenario. The test results show that the decision support
system can store and organize input and output of data processing performed by
users, automate processes that were previously done manually, and the decision
support system can also produce better facility layout design results than without
using a decision support system.
|
---|