STUDY OF IMPLEMENTATION OF CONSTRUCTION TECHNOLOGY 4.0 ON SOE CONTRACTORS IN INDONESIA
Currently the development of construction industry technology is supported by the 4.0 industrial revolution known as "Construction 4.0". The implementation of construction 4.0 is able to answer several challenges that are more predictable and improve overall project management throughou...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/65717 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:65717 |
---|---|
spelling |
id-itb.:657172022-06-24T14:05:43ZSTUDY OF IMPLEMENTATION OF CONSTRUCTION TECHNOLOGY 4.0 ON SOE CONTRACTORS IN INDONESIA Abdhy Gazali HS, Muh Indonesia Theses construction technology, technology 4.0, implementation of technology INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/65717 Currently the development of construction industry technology is supported by the 4.0 industrial revolution known as "Construction 4.0". The implementation of construction 4.0 is able to answer several challenges that are more predictable and improve overall project management throughout the project life cycle so that the level of productivity also increases. The development of the industrial revolution 4.0, which is currently being implemented in the construction business, can certainly be a way to achieve project performance. However, it has not been defined regarding the use, adoption, benefits of this technology in construction projects, and what are the challenges in implementing construction technology in project implementation in Indonesia. The objective to be achieved in this research is to get an overview of the application and benefits of implementing construction technology 4.0 on 5 BUMN contractors in Indonesia. The method used in this research is descriptive qualitative, namely by describing the conditions of implementation of construction 4.0 on large contractors in Indonesia. In this study, there are 3 technology classifications that have been identified, namely Physical Site, Digital Simulation, and Virtual Collaboration. The various classifications of these technologies will then measure the level of implementation and also the level of benefits felt by respondents in this study. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Currently the development of construction industry technology is supported by the
4.0 industrial revolution known as "Construction 4.0". The implementation of
construction 4.0 is able to answer several challenges that are more predictable and
improve overall project management throughout the project life cycle so that the
level of productivity also increases. The development of the industrial revolution
4.0, which is currently being implemented in the construction business, can
certainly be a way to achieve project performance. However, it has not been defined
regarding the use, adoption, benefits of this technology in construction projects, and
what are the challenges in implementing construction technology in project
implementation in Indonesia. The objective to be achieved in this research is to get
an overview of the application and benefits of implementing construction
technology 4.0 on 5 BUMN contractors in Indonesia. The method used in this
research is descriptive qualitative, namely by describing the conditions of
implementation of construction 4.0 on large contractors in Indonesia. In this study,
there are 3 technology classifications that have been identified, namely Physical
Site, Digital Simulation, and Virtual Collaboration. The various classifications of
these technologies will then measure the level of implementation and also the level
of benefits felt by respondents in this study.
|
format |
Theses |
author |
Abdhy Gazali HS, Muh |
spellingShingle |
Abdhy Gazali HS, Muh STUDY OF IMPLEMENTATION OF CONSTRUCTION TECHNOLOGY 4.0 ON SOE CONTRACTORS IN INDONESIA |
author_facet |
Abdhy Gazali HS, Muh |
author_sort |
Abdhy Gazali HS, Muh |
title |
STUDY OF IMPLEMENTATION OF CONSTRUCTION TECHNOLOGY 4.0 ON SOE CONTRACTORS IN INDONESIA |
title_short |
STUDY OF IMPLEMENTATION OF CONSTRUCTION TECHNOLOGY 4.0 ON SOE CONTRACTORS IN INDONESIA |
title_full |
STUDY OF IMPLEMENTATION OF CONSTRUCTION TECHNOLOGY 4.0 ON SOE CONTRACTORS IN INDONESIA |
title_fullStr |
STUDY OF IMPLEMENTATION OF CONSTRUCTION TECHNOLOGY 4.0 ON SOE CONTRACTORS IN INDONESIA |
title_full_unstemmed |
STUDY OF IMPLEMENTATION OF CONSTRUCTION TECHNOLOGY 4.0 ON SOE CONTRACTORS IN INDONESIA |
title_sort |
study of implementation of construction technology 4.0 on soe contractors in indonesia |
url |
https://digilib.itb.ac.id/gdl/view/65717 |
_version_ |
1822004934536593408 |