ANALYSIS ON THE EFFECTIVENESS OF INITIAL SUPPORT ON SWELLING CLAY â A CASE STUDY OF MANIKIN DAM DIVERSION TUNNEL IN KUPANG
The diversion tunnel is one of the main constructions before the construction of the Manikin Dam in Kupang Regency, East Nusa Tenggara Province. This diversion tunnel is built through the Bobonaro formation, which is dominated by clay. During the construction of the diversion tunnel, a problem occur...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/65824 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |