ANALYSIS ON THE EFFECTIVENESS OF INITIAL SUPPORT ON SWELLING CLAY – A CASE STUDY OF MANIKIN DAM DIVERSION TUNNEL IN KUPANG

The diversion tunnel is one of the main constructions before the construction of the Manikin Dam in Kupang Regency, East Nusa Tenggara Province. This diversion tunnel is built through the Bobonaro formation, which is dominated by clay. During the construction of the diversion tunnel, a problem occur...

Full description

Saved in:
Bibliographic Details
Main Author: Stephen
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/65824
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia