EVALUATION OF TRANS SUMATRA TOLL ROAD PLANNING SECTION OF PEMATANG PANGGANG - KAYU AGUNG (STA 140+000 S.D. 161+600)
The need for transportation has become very high. This has led to an increase in road construction in Indonesia, including toll roads. One of the currently operating toll roads in Indonesia is the Trans Sumatra Toll Road Section Pematang Panggang – Kayu Agung which is part of the Trans Sumatra Toll...
Saved in:
Main Author: | Fatra Hadi, Jehant |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/66004 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUATION OF TRANS SUMATRA TOLL ROAD PLANNING SECTION OF PEMATANG PANGGANG â KAYU AGUNG (STA 140+000 S.D. 161+600)
by: Aprilya, Priquela -
ANALYSIS OF ADDING POLYPROPYLENE FIBER TO CONCRETE IN THE DESIGN PLANNING OF RIGID PAVEMENT THICKNESS ON THE TRANS SUMATRA TOLL ROAD (JTTS), SECTION PEMATANG PANGGANG â KAYU AGUNG ZONE 1A STA. 108+600 â 112+600, SOUTH SUMATRA
by: Aria Zhafari, Raditya -
EVALUATION OF GEDEBAGE - TASIKMALAYA - CILACAP (GETACI) TOLL ROAD PLANNING AND FEASIBILITY SECTION OF GEDEBAGE - NAGREG (STA. 0+000 - STA. 22+850)
by: C.P.H. Sihombing, Ari -
EVALUATION OF GEDEBAGE - TASIKMALAYA - CILACAP (GETACI) TOLL ROAD PLANNING AND FEASIBILITY SECTION OF GEDEBAGE - NAGREG (STA. 0+000 - STA. 22+850)
by: Khairunnisa, Iman -
ROAD MAINTENANCE PROGRAMMING BASED ON IRI PREDICTION ANALYSIS USING AASHTO 2008 (MEPDG) AND IRMS METHOD (CASE STUDY: PEMATANG PANGGANG â KAYU AGUNG STA 294+000 UNTIL 304+000 TOLL ROAD SEGMENT)
by: Adlan Wiraprakoso, Hafizhan