STABILITY ANALYSIS AND ALTERNATIVES SLOPE PROTECTION OF SIGLI â BANDA ACEH TOLL ROAD SECTION 1 (PADANG TIJI-SEULIMEUM) STA 15+425 SD 15+700
On the Sigli – Banda Aceh Toll Road Section 1 has a hilly contour and construction work is carried out using the open cut method. To achieve the Finish Grade (FG) of the Toll Road at STA 15+425 to 15+700, excavations are carried out with a planned excavation slope height of up to 40 meters so tha...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/71180 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |