STABILITY ANALYSIS AND ALTERNATIVES SLOPE PROTECTION OF SIGLI â BANDA ACEH TOLL ROAD SECTION 1 (PADANG TIJI-SEULIMEUM) STA 15+425 SD 15+700
On the Sigli – Banda Aceh Toll Road Section 1 has a hilly contour and construction work is carried out using the open cut method. To achieve the Finish Grade (FG) of the Toll Road at STA 15+425 to 15+700, excavations are carried out with a planned excavation slope height of up to 40 meters so tha...
Saved in:
Main Author: | Aditya Yudha, Khrisna |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/71180 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
LANDSLIDE BACK-ANALYSIS ON SIGLI - BANDA ACEH TOLL ROAD STA 10+000 - 10+500, PIDIE REGENCY, ACEH PROVINCE
by: Salsabila Yulita, Putri -
DESIGN OF SOFT SOIL IMPROVEMENT AND SLOPE REINFORCEMENT FOR EXCAVATION AND EMBANKMENT ON THE JAKARTA â CIKAMPEK II SELATAN TOLL ROAD PROJECT FROM STA 09+775 TO STA 15+000
by: Rama Adamas, Nur -
MITIGATION AND LANDSLIDE HANDLING AT MAIN ROAD STA 21+700 BOGOR-CIAWI-SUKABUMI TOLL SECTION 2 DURING THE CONSTRUCTION PERIOD
by: Edward, Marsesa -
ANALYSIS OF TUNNEL STABILITY ON SOFT ROCKS IN TUNNEL 3 SECTION 1 SIGLI â BANDA ACEH TOLL ROAD
by: Alamsyah, Syamsi -
ANALYSIS OF INITIAL SUPPORT DESIGN OF SAMARINDA TUNNEL STA 0+425 USING LATTICE GIRDER WITH 3D MODELING
by: Anugrah Krista, Shela