DECISION ANALYSIS TO PUT BACK LOSS POTENTIAL OIL PRODUCTION DUE TO LIMITED GAS PRODUCTION EXISTING IN SES BLOCK
The SES block is one of the blocks managed by a subsidiary of PT Pertamina (Persero) since 2018. Currently, Block SES operates in the upstream oil and gas. Prior to 2022 Block SES sells oil and gas production to consumers. However, in 2022 Block SES no longer sells gas to consumers due to declinin...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/66227 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:66227 |
---|---|
spelling |
id-itb.:662272022-06-27T14:29:36ZDECISION ANALYSIS TO PUT BACK LOSS POTENTIAL OIL PRODUCTION DUE TO LIMITED GAS PRODUCTION EXISTING IN SES BLOCK Ciptaningsih, Rahmi Manajemen umum Indonesia Theses Loss Potential Oil (LPO), Kepner Tregoe Problem Analysis, Value-Focused Thinking (VFT), SMART (Simple Multi Attribute Rating Technique) INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/66227 The SES block is one of the blocks managed by a subsidiary of PT Pertamina (Persero) since 2018. Currently, Block SES operates in the upstream oil and gas. Prior to 2022 Block SES sells oil and gas production to consumers. However, in 2022 Block SES no longer sells gas to consumers due to declining in gas production. From this business situation, the problem faced by Block SES is the potential loss of oil production due to limited gas production. As a result, the potential loss of oil that will be beared by the SES block is 1002 MBOP which is equivalent to 68,364 million USD and will continue to increase every year if fuel gas cannot be fulfilled. The purpose of this thesis is to find out the root cause of the problems, discover the best alternative, and develop a plan to execute from the best alternative solutions. To find out the root of the problem and create alternative solutions, the process that was followed was brainstorming and focus group discussions with experts. When creating alternative solutions, a value focus thinking (VFT) approach is used. From the process that was passed, five alternative solutions were obtained for further analysis so that the problems faced by Block SES block could be resolved. To analyze the alternative solutions, the SMART method is used because the SMART method breaks down the problem into several small parts and focuses on each part separately. Thus, decision makers can assess the attributes used in this method without the influence of the costs incurred. In addition, decision makers can understand the existing problems. The results of this analysis of alternative solutions concluded that the best alternative for the problems faced by Block SES block is Drilling Maya A-04 well. Drilling MAYA A-04 well can produce 8,715 MMSCF of gas and 3,394 MBO of oil. Drilling MAYA A-04 well also has a good weight on the weight that is prioritized by the decision maker. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Manajemen umum |
spellingShingle |
Manajemen umum Ciptaningsih, Rahmi DECISION ANALYSIS TO PUT BACK LOSS POTENTIAL OIL PRODUCTION DUE TO LIMITED GAS PRODUCTION EXISTING IN SES BLOCK |
description |
The SES block is one of the blocks managed by a subsidiary of PT Pertamina (Persero) since 2018.
Currently, Block SES operates in the upstream oil and gas. Prior to 2022 Block SES sells oil and gas
production to consumers. However, in 2022 Block SES no longer sells gas to consumers due to declining
in gas production. From this business situation, the problem faced by Block SES is the potential loss of
oil production due to limited gas production. As a result, the potential loss of oil that will be beared by
the SES block is 1002 MBOP which is equivalent to 68,364 million USD and will continue to increase
every year if fuel gas cannot be fulfilled.
The purpose of this thesis is to find out the root cause of the problems, discover the best alternative, and
develop a plan to execute from the best alternative solutions. To find out the root of the problem and
create alternative solutions, the process that was followed was brainstorming and focus group
discussions with experts. When creating alternative solutions, a value focus thinking (VFT) approach is
used. From the process that was passed, five alternative solutions were obtained for further analysis so
that the problems faced by Block SES block could be resolved.
To analyze the alternative solutions, the SMART method is used because the SMART method breaks
down the problem into several small parts and focuses on each part separately. Thus, decision makers
can assess the attributes used in this method without the influence of the costs incurred. In addition,
decision makers can understand the existing problems. The results of this analysis of alternative
solutions concluded that the best alternative for the problems faced by Block SES block is Drilling Maya
A-04 well. Drilling MAYA A-04 well can produce 8,715 MMSCF of gas and 3,394 MBO of oil. Drilling
MAYA A-04 well also has a good weight on the weight that is prioritized by the decision maker.
|
format |
Theses |
author |
Ciptaningsih, Rahmi |
author_facet |
Ciptaningsih, Rahmi |
author_sort |
Ciptaningsih, Rahmi |
title |
DECISION ANALYSIS TO PUT BACK LOSS POTENTIAL OIL PRODUCTION DUE TO LIMITED GAS PRODUCTION EXISTING IN SES BLOCK |
title_short |
DECISION ANALYSIS TO PUT BACK LOSS POTENTIAL OIL PRODUCTION DUE TO LIMITED GAS PRODUCTION EXISTING IN SES BLOCK |
title_full |
DECISION ANALYSIS TO PUT BACK LOSS POTENTIAL OIL PRODUCTION DUE TO LIMITED GAS PRODUCTION EXISTING IN SES BLOCK |
title_fullStr |
DECISION ANALYSIS TO PUT BACK LOSS POTENTIAL OIL PRODUCTION DUE TO LIMITED GAS PRODUCTION EXISTING IN SES BLOCK |
title_full_unstemmed |
DECISION ANALYSIS TO PUT BACK LOSS POTENTIAL OIL PRODUCTION DUE TO LIMITED GAS PRODUCTION EXISTING IN SES BLOCK |
title_sort |
decision analysis to put back loss potential oil production due to limited gas production existing in ses block |
url |
https://digilib.itb.ac.id/gdl/view/66227 |
_version_ |
1822005092329455616 |