PROBLEM SOLVING AND ALTERNATIVE SELECTION TO MINIMIZE LOSS OF PRODUCTION OPPORTUNITY AT BANGKO ASSOCIATED GAS RECOVERY PLANT (AGRP) BY USING DECISION ANALYSIS
WK Rokan is the which one of productive field in Indonesia, this field is producing oil and gas, the Bangko AGRP is the gas plant facilities in WK Rokan that producing gas about 3 MMcsdf equivalent with 468 BOEPD. The compressible gas will flow to Pager GP through 10”Gas Pipeline Bangko-Pager GP....
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/74850 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |