DECISION ANALYSIS FOR REPAIR PIPELINE HCT 12" KOTABATAK – MD TIE-IN IN PT. CIPTA PACIFIC INDONESIA

Optimization and efficiency steps are carried out by all companies so that companies can continue to run their company business and can continue to compete. Likewise in the oil and gas industry, optimization and efficiency measures are also carried out. Examples that are carried out by oil and ga...

Full description

Saved in:
Bibliographic Details
Main Author: Abdillah, Deny
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/66731
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:66731
spelling id-itb.:667312022-07-15T08:10:07ZDECISION ANALYSIS FOR REPAIR PIPELINE HCT 12" KOTABATAK – MD TIE-IN IN PT. CIPTA PACIFIC INDONESIA Abdillah, Deny Manajemen umum Indonesia Theses Kepner-Tregoe (KT), VFT, SMART, Decision Analysis, Pipeline, Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/66731 Optimization and efficiency steps are carried out by all companies so that companies can continue to run their company business and can continue to compete. Likewise in the oil and gas industry, optimization and efficiency measures are also carried out. Examples that are carried out by oil and gas companies in optimization and efficiency are ensuring reliable operating conditions, optimizing production results, and reducing unplanned / planned production losses or LPO (loss production opportunity) as well as streamlining every project activity. One of the issues related to operational reliability, and loss of production (LPO) is the production line pipe HCT 12” Batak City – MD Tie-in which is owned by PT. CPI with a production of around 18,000 BOPD. For this reason, further action and in-depth analysis are needed to ensure that the production line pipeline can continue to be operated reliably and can eliminate LPO where a plan to correct this problem is needed. In addition, the results of the RBI show results that require further action, both short-term and long-term plans to avoid the production line pipeline from the HSSE issue. This final project aims to produce a comprehensive solution and recommendations or selected alternatives for improvement plans that will be carried out as the output of this final project. In addition, this final project can prevent events that can have an impact on the environment or injury to the surrounding community who are in the area around the pipe segment which can damage the image of the company PT. CPI. The first methodology used is a situation appraisal using the Kepner-Tregoe (KT) Situation Appraisal. Next to analyze the root of the problem is to use KT Analysis - Problem analysis and verified using the 5 whys method. Alternatives as solutions to problems are carried out using the Value Focused Thinking (VFT) method. And the last is the alternative selection process using the Simple Multi-Attribute Rating Technique (SMART) method. In the process of looking for alternatives and selecting alternatives, four people have experience and knowledge related to piping and project management. The results are then submitted to the leadership (DE & DRB) as decision-makers. Based on the results of the SMART Decision Analysis on the alternatives and the existing project criteria, the full replacement pipe project is the choice of the stakeholder. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Abdillah, Deny
DECISION ANALYSIS FOR REPAIR PIPELINE HCT 12" KOTABATAK – MD TIE-IN IN PT. CIPTA PACIFIC INDONESIA
description Optimization and efficiency steps are carried out by all companies so that companies can continue to run their company business and can continue to compete. Likewise in the oil and gas industry, optimization and efficiency measures are also carried out. Examples that are carried out by oil and gas companies in optimization and efficiency are ensuring reliable operating conditions, optimizing production results, and reducing unplanned / planned production losses or LPO (loss production opportunity) as well as streamlining every project activity. One of the issues related to operational reliability, and loss of production (LPO) is the production line pipe HCT 12” Batak City – MD Tie-in which is owned by PT. CPI with a production of around 18,000 BOPD. For this reason, further action and in-depth analysis are needed to ensure that the production line pipeline can continue to be operated reliably and can eliminate LPO where a plan to correct this problem is needed. In addition, the results of the RBI show results that require further action, both short-term and long-term plans to avoid the production line pipeline from the HSSE issue. This final project aims to produce a comprehensive solution and recommendations or selected alternatives for improvement plans that will be carried out as the output of this final project. In addition, this final project can prevent events that can have an impact on the environment or injury to the surrounding community who are in the area around the pipe segment which can damage the image of the company PT. CPI. The first methodology used is a situation appraisal using the Kepner-Tregoe (KT) Situation Appraisal. Next to analyze the root of the problem is to use KT Analysis - Problem analysis and verified using the 5 whys method. Alternatives as solutions to problems are carried out using the Value Focused Thinking (VFT) method. And the last is the alternative selection process using the Simple Multi-Attribute Rating Technique (SMART) method. In the process of looking for alternatives and selecting alternatives, four people have experience and knowledge related to piping and project management. The results are then submitted to the leadership (DE & DRB) as decision-makers. Based on the results of the SMART Decision Analysis on the alternatives and the existing project criteria, the full replacement pipe project is the choice of the stakeholder.
format Theses
author Abdillah, Deny
author_facet Abdillah, Deny
author_sort Abdillah, Deny
title DECISION ANALYSIS FOR REPAIR PIPELINE HCT 12" KOTABATAK – MD TIE-IN IN PT. CIPTA PACIFIC INDONESIA
title_short DECISION ANALYSIS FOR REPAIR PIPELINE HCT 12" KOTABATAK – MD TIE-IN IN PT. CIPTA PACIFIC INDONESIA
title_full DECISION ANALYSIS FOR REPAIR PIPELINE HCT 12" KOTABATAK – MD TIE-IN IN PT. CIPTA PACIFIC INDONESIA
title_fullStr DECISION ANALYSIS FOR REPAIR PIPELINE HCT 12" KOTABATAK – MD TIE-IN IN PT. CIPTA PACIFIC INDONESIA
title_full_unstemmed DECISION ANALYSIS FOR REPAIR PIPELINE HCT 12" KOTABATAK – MD TIE-IN IN PT. CIPTA PACIFIC INDONESIA
title_sort decision analysis for repair pipeline hct 12" kotabatak – md tie-in in pt. cipta pacific indonesia
url https://digilib.itb.ac.id/gdl/view/66731
_version_ 1822005242513850368