BATCH SCHEDULING MODEL ON A THREE-STAGE FLOWSHOP WITH THE SEQUENCE OF JOB PROCESSOR BATCH PROCESSOR JOB PROCESSOR TO MINIMIZE TOTAL ACTUAL FLOW TIME
This study discusses a batch scheduling model on a three-stage flowshop with the sequence of job processor, batch processor, and job processor that process multiple items. In stage 1 products are processed with a common machine as a job processor, then in stage 2 different types of products can b...
Saved in:
Main Author: | Az Zahro, Shafira |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/66817 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BATCH SCHEDULING MODEL ON THREE-STAGE FLOWSHOP WITH TWO-STAGE JOB PROCESSOR AND ONE STAGE BATCH PROCESSOR TO MINIMIZE TOTAL ACTUAL FLOWTIME
by: Poeri Suryadhini, Pratya -
INTEGRATED PRODUCTION AND DELIVERY BATCH SCHEDULING MODEL FOR A THREE-STAGE FLOW SHOP WITH BATCH-JOB-BATCH PROCESSOR MACHINE SEQUENCES IN ORDER TO MINIMIZE TOTAL INVENTORY AND DELIVERY COST
by: Dwidayanti Putri, Indah -
MULTI-ITEM BATCH SCHEDULING MODEL ON A BATCH PROCESSOR TO MINIMIZE TOTAL ACTUAL FLOW TIME OF PARTS
by: Oktaviana Trisna Devi, Anita -
DEVELOPMENT OF TWO STAGE HYBRID FLOWSHOP MODEL CONSIDERING BATCH PROCESSOR & PARALLEL MACHINES
by: Nauli, Rahmawati -
Scheduling jobs on multi-processors
by: Neetika, Bansal
Published: (2012)