DESIGN OF SOIL IMPROVEMENT WITH STONE COLUMN METHOD FOR STOCKYARD AND EMPLACEMENT IN GARONGKONG TRAIN STATION

The construction of stockyard and emplacement infrastructure for the Garongkong train station is located in Barru, South Sulawesi. Based on the results of soil data processing, the project location has a dominating soil condition in the form of soft soil and a layer of loose sand. This soil conditio...

Full description

Saved in:
Bibliographic Details
Main Author: Jabarudin Nur, Rizal
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/66941
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:66941
spelling id-itb.:669412022-07-27T11:54:10ZDESIGN OF SOIL IMPROVEMENT WITH STONE COLUMN METHOD FOR STOCKYARD AND EMPLACEMENT IN GARONGKONG TRAIN STATION Jabarudin Nur, Rizal Teknik sipil Indonesia Final Project stockyard, emplacement, soil settlement, liquefaction, stability, soil improvement, stone column INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/66941 The construction of stockyard and emplacement infrastructure for the Garongkong train station is located in Barru, South Sulawesi. Based on the results of soil data processing, the project location has a dominating soil condition in the form of soft soil and a layer of loose sand. This soil condition can have a negative impact such as the potential for excessive soil settlement, liquefaction, and embankment stability problems, so soil improvement is needed. This final project contains the design of soil improvement using the stone column method to mitigate excess soil settlement, potential liquefaction, and embankment stability at the stockyard and emplacement locations of the Garongkong train station in Zones 2, 3, and 6. The analysis carried out in this final project starts from processing soil data, checking soil settlement, checking potential for liquefaction, checking embankment stability, designed stone column in mitigating excess soil settlement, liquefaction potential and embankment stability. Evaluation of soil settlement and embankment stability was carried out using numerical methods using MIDAS GTS NX axisymmetric and plane strain modeling. In checking the stability of the embankment using the concept of strength reduction method. The initial check of the liquefaction potential using NCEER method (1998) and the mitigation analysis of the liquefaction potential using empirical method from Baez and Martin (1993). Based on the analysis carried out, it was found that Zones 3 and 6 have the potential to experience excessive soil settlement and liquefaction potential, each zone have a safety factor for embankment stability that does not meet the design criteria. Soil improvement using the stone column method can mitigate these potentials with the design configuration used is a square pattern, 2 m spacing, 1 m diameter for Zones 2 and 3 while 1.1 m for Zone 6, 15 m depth for Zones 3 and 6 while 17 m for Zone 2, and 0.6 m LTP thickness for each zone. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik sipil
spellingShingle Teknik sipil
Jabarudin Nur, Rizal
DESIGN OF SOIL IMPROVEMENT WITH STONE COLUMN METHOD FOR STOCKYARD AND EMPLACEMENT IN GARONGKONG TRAIN STATION
description The construction of stockyard and emplacement infrastructure for the Garongkong train station is located in Barru, South Sulawesi. Based on the results of soil data processing, the project location has a dominating soil condition in the form of soft soil and a layer of loose sand. This soil condition can have a negative impact such as the potential for excessive soil settlement, liquefaction, and embankment stability problems, so soil improvement is needed. This final project contains the design of soil improvement using the stone column method to mitigate excess soil settlement, potential liquefaction, and embankment stability at the stockyard and emplacement locations of the Garongkong train station in Zones 2, 3, and 6. The analysis carried out in this final project starts from processing soil data, checking soil settlement, checking potential for liquefaction, checking embankment stability, designed stone column in mitigating excess soil settlement, liquefaction potential and embankment stability. Evaluation of soil settlement and embankment stability was carried out using numerical methods using MIDAS GTS NX axisymmetric and plane strain modeling. In checking the stability of the embankment using the concept of strength reduction method. The initial check of the liquefaction potential using NCEER method (1998) and the mitigation analysis of the liquefaction potential using empirical method from Baez and Martin (1993). Based on the analysis carried out, it was found that Zones 3 and 6 have the potential to experience excessive soil settlement and liquefaction potential, each zone have a safety factor for embankment stability that does not meet the design criteria. Soil improvement using the stone column method can mitigate these potentials with the design configuration used is a square pattern, 2 m spacing, 1 m diameter for Zones 2 and 3 while 1.1 m for Zone 6, 15 m depth for Zones 3 and 6 while 17 m for Zone 2, and 0.6 m LTP thickness for each zone.
format Final Project
author Jabarudin Nur, Rizal
author_facet Jabarudin Nur, Rizal
author_sort Jabarudin Nur, Rizal
title DESIGN OF SOIL IMPROVEMENT WITH STONE COLUMN METHOD FOR STOCKYARD AND EMPLACEMENT IN GARONGKONG TRAIN STATION
title_short DESIGN OF SOIL IMPROVEMENT WITH STONE COLUMN METHOD FOR STOCKYARD AND EMPLACEMENT IN GARONGKONG TRAIN STATION
title_full DESIGN OF SOIL IMPROVEMENT WITH STONE COLUMN METHOD FOR STOCKYARD AND EMPLACEMENT IN GARONGKONG TRAIN STATION
title_fullStr DESIGN OF SOIL IMPROVEMENT WITH STONE COLUMN METHOD FOR STOCKYARD AND EMPLACEMENT IN GARONGKONG TRAIN STATION
title_full_unstemmed DESIGN OF SOIL IMPROVEMENT WITH STONE COLUMN METHOD FOR STOCKYARD AND EMPLACEMENT IN GARONGKONG TRAIN STATION
title_sort design of soil improvement with stone column method for stockyard and emplacement in garongkong train station
url https://digilib.itb.ac.id/gdl/view/66941
_version_ 1822277772371820544