DESIGN OF SOIL IMPROVEMENT WITH STONE COLUMN METHOD FOR STOCKYARD AND EMPLACEMENT IN GARONGKONG TRAIN STATION
The construction of stockyard and emplacement infrastructure for the Garongkong train station is located in Barru, South Sulawesi. Based on the results of soil data processing, the project location has a dominating soil condition in the form of soft soil and a layer of loose sand. This soil conditio...
Saved in:
Main Author: | Jabarudin Nur, Rizal |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/66941 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF SOIL IMPROVEMENT WITH DEEP SOIL MIXING FOR EMPLACEMENT AND STOCKYARD IN GARONGKONG TRAIN STATION
by: Baihaqi Pasaribu, Irsyad -
SOIL IMPROVEMENT DESIGN USING RIGID INCLUSION METHOD FOR THE GARONGKONG SEAPORT STOCKYARD AND EMPLACEMENT CONSTRUCTION PROJECT
by: Razan Ediansjah, Faikar -
SEISMIC PERFORMANCE EVALUATION OF STONE COLUMN AT GARONGKONG TRAIN STATION USING GROUND MOTION OF 2018 PALU EARTHQUAKE
by: Jabarudin Nur, Rizal -
SEISMIC PERFORMANCE EVALUATION OF GROUND IMPROVEMENT USING DEEP SOIL MIXING METHOD AT GARONGKONG TRAIN STATION DURING THE 2018 PALU EARTHQUAKE
by: Baihaqi Pasaribu, Irsyad -
STUDY ANALYSIS OF EMBANKMENT DESIGN ON SOFT SOIL USING PILED EMBANKMENT SOIL IMPROVEMENT METHOD FOR EMPLASEMENT AND STOCKYARD CONSTRUCTION IN SOUTH SULAWESI
by: RIZKI RAMADHAN, ANUGRAH