EVALUATION OF TRANS SUMATRA TOLL ROAD PLANNING SECTION OF PEMATANG PANGGANG â KAYU AGUNG (STA 140+000 S.D. 161+600)
The need for transportation has become very high. This has led to an increase in road construction in Indonesia, including toll roads. One of the currently operating toll roads in Indonesia is the Trans Sumatra Toll Road Section Pematang Panggang – Kayu Agung which is part of the Trans Sumatra To...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/66989 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | The need for transportation has become very high. This has led to an increase in
road construction in Indonesia, including toll roads. One of the currently operating
toll roads in Indonesia is the Trans Sumatra Toll Road Section Pematang Panggang
– Kayu Agung which is part of the Trans Sumatra Toll Road project. Proper toll
road planning is needed so that Trans Sumatra Toll Road could serve the traffic
needs effectively. The estimation of traffic demand on trans Sumatra Toll Road is
carried out using the four-stage transportation planning model, which is the trip
generation, trip distribution, modal split, and trip assignment. The modeling results
show the traffic flow of 5,390 vehicles per day in 2019 with a growth of 4.89% per
year to reach 15,930 vehicles per day at the end of the road’s service life in 2059.
Based on the traffic modeling results, the toll road is designed using a 4/2 D road
type. The toll road has a length of 21,96 km with a design speed of 100 kmh. The
main road is designed with 8 PI (horizontal alignment) and 10 PVI (vertical
alignment). In addition to the main road, 2 trumpet interchanges (entry and exit)
are also designed with 4 ramps of each interchange using 1/1 road type. The
pavement is designed using continuously reinforced concrete pavement (CRCP),
with a thickness of 20 cm concrete slab, 10 cm lean mix concrete, and 15 cm
aggregate foundation. The toll road drainage is designed using a trapezoidal side
ditch channel with dimensions of b = 0,6 m and h = 1 m and 43 reinforced concrete
box culverts with dimensions of 1,5 x 1,5 x 1 m.
The total estimated construction cost of the toll road reaches
Rp1,929,928,428,635.34. Based on the investment cost and revenue analysis, a
financial analysis is also carried out using the methods of net present value, benefitcost
ratio, internal rate of return, and payback period. Based on the NPV, BCR,
payback period, and IRR method, it is deemed that the toll road is financially
ineligible for construction and higher government support is needed to reduce the
construction costs borne by the BUJT. This is intended to make the project
financially viable.
|
---|