STUDY ON IMPLEMENTATION OF 5S METHODS (SEIRI, SEITON, SEISO, SEIKETSU, SHITSUKE) IN CONSTRUCTION PROJECTS CASE STUDY : THE MAIN BUILDING PROJECT OF THE AGO OF THE REPUBLIC OF INDONESIA
The 5S method occupies the second position as the method in lean construction that is most widely applied by several BUMN contractors in Indonesia. 5S method aims to create an organized, neat, and clean work environment to increase productivity. For now, several contractors in Indonesia are implemen...
Saved in:
Main Author: | Nur Huda, Fikri |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/66991 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Implementasi strategi berorientasi pada 5S (Seiri, Seiton, Seiso, seiketsu....
by: Mohamad Ilham, 090315040M
Published: (2006) -
Implementasi Budaya Kerja 5S (Seiri, Seiton, Seiso, Seiketsu, Dan Shitsuke) Pada Bagian Teknik Pt Japfa Comfeed Indonesia tbk. (Plant Gedangan)
by: Maghfira Mulia Azzahra, -
Published: (2023) -
EVALUASI SIKAP KERJA 5S (Seiri, Seiton, Seiso, Seiketsu, dan
Shitsuke) PADA RITEL MODERN SAKINAH SURABAYA
DENGAN METODE IMPORTANCE PERFORMANCE ANALYSIS
DAN CAUSE AND EFFECT DIAGRAM
by: NISA RAHMI ARDLILLAH, NIM : 041411223072
Published: (2017) -
Agos
by: Castro, Jewel C.
Published: (2004) -
CONSTRUCTION MANAGEMENT DESIGN OF CENTER FOR INFRASTRUCTURE AND BUILT ENVIRONMENT (CIBE) ITB MAIN BUILDING PROJECT
by: JOSUA SIMAMORA (NIM : 15011150), NAEL