PROPOSED SOLUTION TO IMPROVE PROJECT MANAGEMENT PERFORMANCE IN PT XYZ CASE STUDY : PADANG GEOTHERMAL POWER PLAN PROJECT

PT XYZ was founded on August 12, 1981. PT XYZ is a subsidiary of national fertilizer company and engaged in the provision of EPC (Engineering, Procurement, Construction) services. During the last three years(2018 – 2020), the company has experienced a decline in project performance as indicated by t...

Full description

Saved in:
Bibliographic Details
Main Author: Ismayanto, Doma
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/67640
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:67640
spelling id-itb.:676402022-08-24T14:35:18ZPROPOSED SOLUTION TO IMPROVE PROJECT MANAGEMENT PERFORMANCE IN PT XYZ CASE STUDY : PADANG GEOTHERMAL POWER PLAN PROJECT Ismayanto, Doma Manajemen umum Indonesia Theses Manajemen Kinerja INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/67640 PT XYZ was founded on August 12, 1981. PT XYZ is a subsidiary of national fertilizer company and engaged in the provision of EPC (Engineering, Procurement, Construction) services. During the last three years(2018 – 2020), the company has experienced a decline in project performance as indicated by the Schedule Performance Index (SPI) and Cost Performance Index (CPI). In 2020 the company got a lowest SPI score of 0.92 (normal value should be above 1) and a CPI score of 0.97 (normal value above 1) which indicates there is a time delay in terms of schedule and cost overruns on projects handled by PT XYZ. The research begins with an assessment of the project management knowledge area at PT XYZ based on the Project Management Body of Knowledge (PMBOK) methodology published by the Project Management Institute, then author uses the Current Reality Tree to identify the root causes of problems. The root of the problems will be used to formulate business solutions that will be provided as a result of this investigation. The material was gathered through interviews, analysis, and observation. From the results of collecting information through interviews, analysis and observation. The author decided to create a business solution designed to increase SPI and CPI at PT XYZ which can then have an impact on the level of capability and productivity of the company in accepting the accepted project, increasing efficiency which will certainly bring profit for the company. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Ismayanto, Doma
PROPOSED SOLUTION TO IMPROVE PROJECT MANAGEMENT PERFORMANCE IN PT XYZ CASE STUDY : PADANG GEOTHERMAL POWER PLAN PROJECT
description PT XYZ was founded on August 12, 1981. PT XYZ is a subsidiary of national fertilizer company and engaged in the provision of EPC (Engineering, Procurement, Construction) services. During the last three years(2018 – 2020), the company has experienced a decline in project performance as indicated by the Schedule Performance Index (SPI) and Cost Performance Index (CPI). In 2020 the company got a lowest SPI score of 0.92 (normal value should be above 1) and a CPI score of 0.97 (normal value above 1) which indicates there is a time delay in terms of schedule and cost overruns on projects handled by PT XYZ. The research begins with an assessment of the project management knowledge area at PT XYZ based on the Project Management Body of Knowledge (PMBOK) methodology published by the Project Management Institute, then author uses the Current Reality Tree to identify the root causes of problems. The root of the problems will be used to formulate business solutions that will be provided as a result of this investigation. The material was gathered through interviews, analysis, and observation. From the results of collecting information through interviews, analysis and observation. The author decided to create a business solution designed to increase SPI and CPI at PT XYZ which can then have an impact on the level of capability and productivity of the company in accepting the accepted project, increasing efficiency which will certainly bring profit for the company.
format Theses
author Ismayanto, Doma
author_facet Ismayanto, Doma
author_sort Ismayanto, Doma
title PROPOSED SOLUTION TO IMPROVE PROJECT MANAGEMENT PERFORMANCE IN PT XYZ CASE STUDY : PADANG GEOTHERMAL POWER PLAN PROJECT
title_short PROPOSED SOLUTION TO IMPROVE PROJECT MANAGEMENT PERFORMANCE IN PT XYZ CASE STUDY : PADANG GEOTHERMAL POWER PLAN PROJECT
title_full PROPOSED SOLUTION TO IMPROVE PROJECT MANAGEMENT PERFORMANCE IN PT XYZ CASE STUDY : PADANG GEOTHERMAL POWER PLAN PROJECT
title_fullStr PROPOSED SOLUTION TO IMPROVE PROJECT MANAGEMENT PERFORMANCE IN PT XYZ CASE STUDY : PADANG GEOTHERMAL POWER PLAN PROJECT
title_full_unstemmed PROPOSED SOLUTION TO IMPROVE PROJECT MANAGEMENT PERFORMANCE IN PT XYZ CASE STUDY : PADANG GEOTHERMAL POWER PLAN PROJECT
title_sort proposed solution to improve project management performance in pt xyz case study : padang geothermal power plan project
url https://digilib.itb.ac.id/gdl/view/67640
_version_ 1822933403776843776