PROPOSED SOLUTION TO IMPROVE PROJECT MANAGEMENT PERFORMANCE IN PT XYZ CASE STUDY : PADANG GEOTHERMAL POWER PLAN PROJECT
PT XYZ was founded on August 12, 1981. PT XYZ is a subsidiary of national fertilizer company and engaged in the provision of EPC (Engineering, Procurement, Construction) services. During the last three years(2018 – 2020), the company has experienced a decline in project performance as indicated by t...
Saved in:
Main Author: | Ismayanto, Doma |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/67640 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PROPOSED PROJECT MANAGEMENT SYSTEM FOR PT XYZ
by: Satiamulyana, Ardi -
DECISION MAKING AND PROJECT ANALYSIS OF PT XYZ POWER GENERATION CAPABILITY IMPROVEMENT
by: Karunia, Priza -
Communication Flow Management Analysis On Selling Improvement Project (PT XYZ)
by: Nur Muhammad, Rizky -
PROPOSED PROJECT MANAGEMENT PLANNING DEVELOPMENT FOR PT APS INDONESIA
by: Movita Fitriana, Tiwi -
IMPROVING PROJECT EXECUTION BUDGET PERFORMANCE IN SOIL CLEAN UP PROJECT (A Study of Six Sigma in PT XYZ Environment Project)
by: Legawa, Patria