ANALYSIS OF LANDSLIDES POTENTIAL ON THE STONE SLOPE AROUND THE WATER WAY AT PLTM CILAKI 1B, GARUT REGENCY, WEST JAVA
The PLTM (Microhydro Power Plant) Cilaki 1B is one of the power plant projects owned by PT Sinergi Solusi Utama (SSU) located on the Cilaki River, Cibengang Village, Garut, West Java. On the PLTM water way, there are rock slopes that have the potential for landslides to occur. Stereographic analysis...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/67707 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |