RISK ASSESSMENT WITH REMAINING LIFE TIME FOR 32” GAS PIPELINE NGLB - CLMY BASED ON DNVGL-RP-F101

As per 2021, energy demand has increased globally and expected to leverage dramatically in the end of 2040, particularly for fossil energy. Predominant contributors are developing countries, includes Indonesia. As a consequences of fossil energy increasing, pipeline construction will peak up. Those...

Full description

Saved in:
Bibliographic Details
Main Author: Andre Fernanda, Bara
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/67921
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items