CONSTRUCTION MANAGEMENT PLAN OF ACCESSIBLE HUB AT KEBON KAWUNG TRAIN STATION AREA BANDUNG

The Kebon Kawung Accessible Hub Development Project is located at the Bandung Railway Station and stretches from the north side of the station (Jalan Kebon Kawung No. 43 Bandung) to the south side of the station (Jalan Timur Station No. 1 Bandung). The land area of this project is 21,500 m2 and t...

Full description

Saved in:
Bibliographic Details
Main Author: Matheus Nasution, Redi
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/67943
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:67943
spelling id-itb.:679432022-08-29T09:50:38ZCONSTRUCTION MANAGEMENT PLAN OF ACCESSIBLE HUB AT KEBON KAWUNG TRAIN STATION AREA BANDUNG Matheus Nasution, Redi Indonesia Final Project Implementation Method, Budget Plan, Scheduling, S-Curve, Kebon Kawung, Accessible Hub INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/67943 The Kebon Kawung Accessible Hub Development Project is located at the Bandung Railway Station and stretches from the north side of the station (Jalan Kebon Kawung No. 43 Bandung) to the south side of the station (Jalan Timur Station No. 1 Bandung). The land area of this project is 21,500 m2 and the building area is 9,500 m2. This project consists of 3 floors and 1 mezzanine. The lower structure uses bored pile foundations and the upper structure uses reinforced concrete. In this final project, 1 type of formwork is used, namely conventional formwork with scaffolding and temporary portal scaffolding for work areas on active railroads. Calculation of time and cost is calculated based on the implementation method in accordance with the theory from various references used. The purpose of the preparation of this final project is to obtain the right construction method and the optimal point of the relationship between project time and cost. For scheduling each work item, it is done using the Ms. Projects. The final results obtained are the implementation method, duration, budget plan and S curve. Based on the analysis, the duration is 364 working days with an implementation cost budget of Rp.70 billion. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The Kebon Kawung Accessible Hub Development Project is located at the Bandung Railway Station and stretches from the north side of the station (Jalan Kebon Kawung No. 43 Bandung) to the south side of the station (Jalan Timur Station No. 1 Bandung). The land area of this project is 21,500 m2 and the building area is 9,500 m2. This project consists of 3 floors and 1 mezzanine. The lower structure uses bored pile foundations and the upper structure uses reinforced concrete. In this final project, 1 type of formwork is used, namely conventional formwork with scaffolding and temporary portal scaffolding for work areas on active railroads. Calculation of time and cost is calculated based on the implementation method in accordance with the theory from various references used. The purpose of the preparation of this final project is to obtain the right construction method and the optimal point of the relationship between project time and cost. For scheduling each work item, it is done using the Ms. Projects. The final results obtained are the implementation method, duration, budget plan and S curve. Based on the analysis, the duration is 364 working days with an implementation cost budget of Rp.70 billion.
format Final Project
author Matheus Nasution, Redi
spellingShingle Matheus Nasution, Redi
CONSTRUCTION MANAGEMENT PLAN OF ACCESSIBLE HUB AT KEBON KAWUNG TRAIN STATION AREA BANDUNG
author_facet Matheus Nasution, Redi
author_sort Matheus Nasution, Redi
title CONSTRUCTION MANAGEMENT PLAN OF ACCESSIBLE HUB AT KEBON KAWUNG TRAIN STATION AREA BANDUNG
title_short CONSTRUCTION MANAGEMENT PLAN OF ACCESSIBLE HUB AT KEBON KAWUNG TRAIN STATION AREA BANDUNG
title_full CONSTRUCTION MANAGEMENT PLAN OF ACCESSIBLE HUB AT KEBON KAWUNG TRAIN STATION AREA BANDUNG
title_fullStr CONSTRUCTION MANAGEMENT PLAN OF ACCESSIBLE HUB AT KEBON KAWUNG TRAIN STATION AREA BANDUNG
title_full_unstemmed CONSTRUCTION MANAGEMENT PLAN OF ACCESSIBLE HUB AT KEBON KAWUNG TRAIN STATION AREA BANDUNG
title_sort construction management plan of accessible hub at kebon kawung train station area bandung
url https://digilib.itb.ac.id/gdl/view/67943
_version_ 1822278070900359168