DYNAMICS ANALYSIS OF LONG COAL TRAIN 120 WAGONS DURING BRAKING

The Long Coal Train (Babaranjang Train) is the main transportation used for the coal distribution in South Sumatra. To increase the carrying capacity, PT KAI plans to add the number of wagons in a series to 120 wagons from around 60 wagons. Because of this addition, it is necessary to carry out f...

Full description

Saved in:
Bibliographic Details
Main Author: Nuansa Kharisma, Fariz
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/68116
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:68116
spelling id-itb.:681162022-09-07T10:04:35ZDYNAMICS ANALYSIS OF LONG COAL TRAIN 120 WAGONS DURING BRAKING Nuansa Kharisma, Fariz Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Final Project Babaranjang Train, wagon, braking, coupler force, derailment INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/68116 The Long Coal Train (Babaranjang Train) is the main transportation used for the coal distribution in South Sumatra. To increase the carrying capacity, PT KAI plans to add the number of wagons in a series to 120 wagons from around 60 wagons. Because of this addition, it is necessary to carry out further analysis regarding the dynamic performance of the long freight train during braking. The braking system used by Babaranjang Train is pneumatic brakes. The braking condition will work when the air pressure in the brake main pipe decreases. The pressure drop starts from the front locomotive. This causes nonuniformity in the application of braking in each wagon along the train. Consequently, there is a collision of rear vehicles into front vehicles so that the force acting on the connection between vehicles in the train or also called coupler force increases during braking and this increases the risk of derailment. In this final project, the modeling step and simulation process of the Babaranjang train were carried out using Universal Mechanism software. The model built is a train that consists of 4 locomotives and 120 wagons. The simulation results with an initial speed of 50 km/h and a curve radius of 500 m show that the position of the wagon that experiences the largest coupler force is the 66th wagon after braking is done. Simulations are also carried out by varying the input parameters which include wagon loads, braking modes, brake blocks, types of curves, and rail conditions. The simulation results show that the parameters of the loaded wagons, emergency braking, and composite brake block increase the maximum coupler force. Then, the parameters of empty wagons, emergency braking, composite brake block, and S-curve increase the maximum derailment coefficient. Simulation with rail irregularities shows that operating the train on a curve with a maximum cant is more dangerous than a curve without a cant. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Nuansa Kharisma, Fariz
DYNAMICS ANALYSIS OF LONG COAL TRAIN 120 WAGONS DURING BRAKING
description The Long Coal Train (Babaranjang Train) is the main transportation used for the coal distribution in South Sumatra. To increase the carrying capacity, PT KAI plans to add the number of wagons in a series to 120 wagons from around 60 wagons. Because of this addition, it is necessary to carry out further analysis regarding the dynamic performance of the long freight train during braking. The braking system used by Babaranjang Train is pneumatic brakes. The braking condition will work when the air pressure in the brake main pipe decreases. The pressure drop starts from the front locomotive. This causes nonuniformity in the application of braking in each wagon along the train. Consequently, there is a collision of rear vehicles into front vehicles so that the force acting on the connection between vehicles in the train or also called coupler force increases during braking and this increases the risk of derailment. In this final project, the modeling step and simulation process of the Babaranjang train were carried out using Universal Mechanism software. The model built is a train that consists of 4 locomotives and 120 wagons. The simulation results with an initial speed of 50 km/h and a curve radius of 500 m show that the position of the wagon that experiences the largest coupler force is the 66th wagon after braking is done. Simulations are also carried out by varying the input parameters which include wagon loads, braking modes, brake blocks, types of curves, and rail conditions. The simulation results show that the parameters of the loaded wagons, emergency braking, and composite brake block increase the maximum coupler force. Then, the parameters of empty wagons, emergency braking, composite brake block, and S-curve increase the maximum derailment coefficient. Simulation with rail irregularities shows that operating the train on a curve with a maximum cant is more dangerous than a curve without a cant.
format Final Project
author Nuansa Kharisma, Fariz
author_facet Nuansa Kharisma, Fariz
author_sort Nuansa Kharisma, Fariz
title DYNAMICS ANALYSIS OF LONG COAL TRAIN 120 WAGONS DURING BRAKING
title_short DYNAMICS ANALYSIS OF LONG COAL TRAIN 120 WAGONS DURING BRAKING
title_full DYNAMICS ANALYSIS OF LONG COAL TRAIN 120 WAGONS DURING BRAKING
title_fullStr DYNAMICS ANALYSIS OF LONG COAL TRAIN 120 WAGONS DURING BRAKING
title_full_unstemmed DYNAMICS ANALYSIS OF LONG COAL TRAIN 120 WAGONS DURING BRAKING
title_sort dynamics analysis of long coal train 120 wagons during braking
url https://digilib.itb.ac.id/gdl/view/68116
_version_ 1822933547732697088