DYNAMICS ANALYSIS OF LONG COAL TRAIN 120 WAGONS DURING BRAKING
The Long Coal Train (Babaranjang Train) is the main transportation used for the coal distribution in South Sumatra. To increase the carrying capacity, PT KAI plans to add the number of wagons in a series to 120 wagons from around 60 wagons. Because of this addition, it is necessary to carry out f...
Saved in:
Main Author: | Nuansa Kharisma, Fariz |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/68116 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DEVELOPMENT OF COEFFICIENT OF FRICTION COMPOSITE BRAKES LOW FOR TRAIN BLOCK BRAKES
by: Ezelo, Ridho -
FAILURE ANALYSIS OF FLAT WAGON 54 TON (GD 54) STRUCTURES
by: Mushlih Elhafid, Muhammad -
SCHEDULING BASED REGENERATIVE BRAKING ENERGY OPTIMIZATION FOR PERFORMANCE EFFICIENCY OF TANGERANG-DURI CORRIDOR ELECTRIC RAIL TRAIN WITH GENETIC ALGORITHM METHOD
by: Sobar Muhamad Fatoni, Maskuri -
ANALYSIS OF SCALED DOWN AUTOMATED GUIDED VEHICLE CONTAINER BRAKING SYSTEM
by: Rasyid Ahmad, Ibrahim -
ANALYSIS OF SCALED DOWN AUTOMATED GUIDED VEHICLE CONTAINER BRAKING SYSTEM
by: Rasyid Ahmad, Ibrahim