#TITLE_ALTERNATIVE#

</i><b>Abstract: </b><p align="justify"><i><br />PT. PJB as an electric producer company must be more efficient in its business. Especially for facing a competitive era in electricity business and a fact of higher energy price condition. Fuel energy bill...

Full description

Saved in:
Bibliographic Details
Main Author: Utomo , Sulistyo
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/6813
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:6813
spelling id-itb.:68132007-05-28T13:39:01Z#TITLE_ALTERNATIVE# Utomo , Sulistyo Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/6813 </i><b>Abstract: </b><p align="justify"><i><br />PT. PJB as an electric producer company must be more efficient in its business. Especially for facing a competitive era in electricity business and a fact of higher energy price condition. Fuel energy bill is the highest operating cost component for PT. PJB.<br /><br />PT. PJB has been applying a policy to drive energy use as an element of the company's efficiency drive program, through power plant heat rate driving. However, power plant heat rate performance was worsening, and it is not according with the commitment of PT. PJB Board that will assurance the better company performance year by year.<br /><br />An evaluation of policy and energy management process results a proposal to improve it by adding its attributes or activities, and to support board's commitment. The one of that is an energy audit activity, as a performance measurement method. An energy audit consists of a detailed examination of how a facility use energy, where an opportunities energy saving are, and finally, a recommended program for changes in operating practice or energy -consuming equipment. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description </i><b>Abstract: </b><p align="justify"><i><br />PT. PJB as an electric producer company must be more efficient in its business. Especially for facing a competitive era in electricity business and a fact of higher energy price condition. Fuel energy bill is the highest operating cost component for PT. PJB.<br /><br />PT. PJB has been applying a policy to drive energy use as an element of the company's efficiency drive program, through power plant heat rate driving. However, power plant heat rate performance was worsening, and it is not according with the commitment of PT. PJB Board that will assurance the better company performance year by year.<br /><br />An evaluation of policy and energy management process results a proposal to improve it by adding its attributes or activities, and to support board's commitment. The one of that is an energy audit activity, as a performance measurement method. An energy audit consists of a detailed examination of how a facility use energy, where an opportunities energy saving are, and finally, a recommended program for changes in operating practice or energy -consuming equipment.
format Theses
author Utomo , Sulistyo
spellingShingle Utomo , Sulistyo
#TITLE_ALTERNATIVE#
author_facet Utomo , Sulistyo
author_sort Utomo , Sulistyo
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/6813
_version_ 1820663980523257856