PENGALOKASIAN OPERASI KE STASIUN KERJA UNTUK LINTASAN PRODUKSI SARUNG TANGAN GOLF PADA PT CAHAYA PERADA ABADI

PT Cahaya Perada Abadi (CPA) is a company engaged in manufacturing by producing golf gloves. PT CPA implements a make-to-order manufacturing system, where gloves will be produced after an order from the parent company, namely PT Adira Semesta Industry. The production process of golf gloves includ...

Full description

Saved in:
Bibliographic Details
Main Author: Putri, Sharleen
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/68334
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:68334
spelling id-itb.:683342022-09-14T07:42:04ZPENGALOKASIAN OPERASI KE STASIUN KERJA UNTUK LINTASAN PRODUKSI SARUNG TANGAN GOLF PADA PT CAHAYA PERADA ABADI Putri, Sharleen Indonesia Final Project line balancing, production line, SALBP-1M, workstation, cycle time INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/68334 PT Cahaya Perada Abadi (CPA) is a company engaged in manufacturing by producing golf gloves. PT CPA implements a make-to-order manufacturing system, where gloves will be produced after an order from the parent company, namely PT Adira Semesta Industry. The production process of golf gloves includes cutting, pasting, sewing, and checking product quality. PT CPA produces several different types of golf gloves. In this study, the types of gloves reviewed consisted of three types of gloves, namely Q3, Zf, and MG. PT CPA has a problem in the form of not achieving the production target of 53 boxes/day. Based on data from November 2021 to May 2022, the number of boxes produced was only 26 boxes/day. Therefore, the research was conducted by allocating operations to workstations so that production targets can be achieved. The objective function of this allocation is the minimization of the number of workstations. In addition, this research also produces alternative solutions in the form of allocating operations to stations, if the number of machines matches the existing conditions. The objective function of the second allocation is the minimization of cycle time. Problem-solving is done by using a linear programming model that refers to the SALBP-1M model. The computational model of this research was performed with IBM LOG CPLEX Studio IDE 12.10.0 software. Based on the computational results, the minimum number of workstations required from the first allocation so that the production target can be achieved is 26 workstations. Meanwhile, the minimum cycle time of the second allocation is 12.64 minutes/box with a total production of 37 boxes/day. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Cahaya Perada Abadi (CPA) is a company engaged in manufacturing by producing golf gloves. PT CPA implements a make-to-order manufacturing system, where gloves will be produced after an order from the parent company, namely PT Adira Semesta Industry. The production process of golf gloves includes cutting, pasting, sewing, and checking product quality. PT CPA produces several different types of golf gloves. In this study, the types of gloves reviewed consisted of three types of gloves, namely Q3, Zf, and MG. PT CPA has a problem in the form of not achieving the production target of 53 boxes/day. Based on data from November 2021 to May 2022, the number of boxes produced was only 26 boxes/day. Therefore, the research was conducted by allocating operations to workstations so that production targets can be achieved. The objective function of this allocation is the minimization of the number of workstations. In addition, this research also produces alternative solutions in the form of allocating operations to stations, if the number of machines matches the existing conditions. The objective function of the second allocation is the minimization of cycle time. Problem-solving is done by using a linear programming model that refers to the SALBP-1M model. The computational model of this research was performed with IBM LOG CPLEX Studio IDE 12.10.0 software. Based on the computational results, the minimum number of workstations required from the first allocation so that the production target can be achieved is 26 workstations. Meanwhile, the minimum cycle time of the second allocation is 12.64 minutes/box with a total production of 37 boxes/day.
format Final Project
author Putri, Sharleen
spellingShingle Putri, Sharleen
PENGALOKASIAN OPERASI KE STASIUN KERJA UNTUK LINTASAN PRODUKSI SARUNG TANGAN GOLF PADA PT CAHAYA PERADA ABADI
author_facet Putri, Sharleen
author_sort Putri, Sharleen
title PENGALOKASIAN OPERASI KE STASIUN KERJA UNTUK LINTASAN PRODUKSI SARUNG TANGAN GOLF PADA PT CAHAYA PERADA ABADI
title_short PENGALOKASIAN OPERASI KE STASIUN KERJA UNTUK LINTASAN PRODUKSI SARUNG TANGAN GOLF PADA PT CAHAYA PERADA ABADI
title_full PENGALOKASIAN OPERASI KE STASIUN KERJA UNTUK LINTASAN PRODUKSI SARUNG TANGAN GOLF PADA PT CAHAYA PERADA ABADI
title_fullStr PENGALOKASIAN OPERASI KE STASIUN KERJA UNTUK LINTASAN PRODUKSI SARUNG TANGAN GOLF PADA PT CAHAYA PERADA ABADI
title_full_unstemmed PENGALOKASIAN OPERASI KE STASIUN KERJA UNTUK LINTASAN PRODUKSI SARUNG TANGAN GOLF PADA PT CAHAYA PERADA ABADI
title_sort pengalokasian operasi ke stasiun kerja untuk lintasan produksi sarung tangan golf pada pt cahaya perada abadi
url https://digilib.itb.ac.id/gdl/view/68334
_version_ 1822933612747554816