PENGALOKASIAN OPERASI KE STASIUN KERJA UNTUK LINTASAN PRODUKSI SARUNG TANGAN GOLF PADA PT CAHAYA PERADA ABADI
PT Cahaya Perada Abadi (CPA) is a company engaged in manufacturing by producing golf gloves. PT CPA implements a make-to-order manufacturing system, where gloves will be produced after an order from the parent company, namely PT Adira Semesta Industry. The production process of golf gloves includ...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/68334 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:68334 |
---|---|
spelling |
id-itb.:683342022-09-14T07:42:04ZPENGALOKASIAN OPERASI KE STASIUN KERJA UNTUK LINTASAN PRODUKSI SARUNG TANGAN GOLF PADA PT CAHAYA PERADA ABADI Putri, Sharleen Indonesia Final Project line balancing, production line, SALBP-1M, workstation, cycle time INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/68334 PT Cahaya Perada Abadi (CPA) is a company engaged in manufacturing by producing golf gloves. PT CPA implements a make-to-order manufacturing system, where gloves will be produced after an order from the parent company, namely PT Adira Semesta Industry. The production process of golf gloves includes cutting, pasting, sewing, and checking product quality. PT CPA produces several different types of golf gloves. In this study, the types of gloves reviewed consisted of three types of gloves, namely Q3, Zf, and MG. PT CPA has a problem in the form of not achieving the production target of 53 boxes/day. Based on data from November 2021 to May 2022, the number of boxes produced was only 26 boxes/day. Therefore, the research was conducted by allocating operations to workstations so that production targets can be achieved. The objective function of this allocation is the minimization of the number of workstations. In addition, this research also produces alternative solutions in the form of allocating operations to stations, if the number of machines matches the existing conditions. The objective function of the second allocation is the minimization of cycle time. Problem-solving is done by using a linear programming model that refers to the SALBP-1M model. The computational model of this research was performed with IBM LOG CPLEX Studio IDE 12.10.0 software. Based on the computational results, the minimum number of workstations required from the first allocation so that the production target can be achieved is 26 workstations. Meanwhile, the minimum cycle time of the second allocation is 12.64 minutes/box with a total production of 37 boxes/day. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
PT Cahaya Perada Abadi (CPA) is a company engaged in manufacturing by
producing golf gloves. PT CPA implements a make-to-order manufacturing system,
where gloves will be produced after an order from the parent company, namely PT
Adira Semesta Industry. The production process of golf gloves includes cutting,
pasting, sewing, and checking product quality. PT CPA produces several different
types of golf gloves. In this study, the types of gloves reviewed consisted of three
types of gloves, namely Q3, Zf, and MG.
PT CPA has a problem in the form of not achieving the production target of 53
boxes/day. Based on data from November 2021 to May 2022, the number of boxes
produced was only 26 boxes/day. Therefore, the research was conducted by
allocating operations to workstations so that production targets can be achieved.
The objective function of this allocation is the minimization of the number of
workstations. In addition, this research also produces alternative solutions in the
form of allocating operations to stations, if the number of machines matches the
existing conditions. The objective function of the second allocation is the
minimization of cycle time. Problem-solving is done by using a linear programming
model that refers to the SALBP-1M model.
The computational model of this research was performed with IBM LOG CPLEX
Studio IDE 12.10.0 software. Based on the computational results, the minimum
number of workstations required from the first allocation so that the production
target can be achieved is 26 workstations. Meanwhile, the minimum cycle time of
the second allocation is 12.64 minutes/box with a total production of 37 boxes/day.
|
format |
Final Project |
author |
Putri, Sharleen |
spellingShingle |
Putri, Sharleen PENGALOKASIAN OPERASI KE STASIUN KERJA UNTUK LINTASAN PRODUKSI SARUNG TANGAN GOLF PADA PT CAHAYA PERADA ABADI |
author_facet |
Putri, Sharleen |
author_sort |
Putri, Sharleen |
title |
PENGALOKASIAN OPERASI KE STASIUN KERJA UNTUK LINTASAN PRODUKSI SARUNG TANGAN GOLF PADA PT CAHAYA PERADA ABADI |
title_short |
PENGALOKASIAN OPERASI KE STASIUN KERJA UNTUK LINTASAN PRODUKSI SARUNG TANGAN GOLF PADA PT CAHAYA PERADA ABADI |
title_full |
PENGALOKASIAN OPERASI KE STASIUN KERJA UNTUK LINTASAN PRODUKSI SARUNG TANGAN GOLF PADA PT CAHAYA PERADA ABADI |
title_fullStr |
PENGALOKASIAN OPERASI KE STASIUN KERJA UNTUK LINTASAN PRODUKSI SARUNG TANGAN GOLF PADA PT CAHAYA PERADA ABADI |
title_full_unstemmed |
PENGALOKASIAN OPERASI KE STASIUN KERJA UNTUK LINTASAN PRODUKSI SARUNG TANGAN GOLF PADA PT CAHAYA PERADA ABADI |
title_sort |
pengalokasian operasi ke stasiun kerja untuk lintasan produksi sarung tangan golf pada pt cahaya perada abadi |
url |
https://digilib.itb.ac.id/gdl/view/68334 |
_version_ |
1822933612747554816 |