ANALYSIS OF TUNNEL EXCAVATION THROUGH CLAYSHALE (CASE STUDY: JAKARTA-BANDUNG HIGHSPEED RAILWAY)

Tunnel construction in West Java, more specifically for the Jakarta-Bandung Highspeed Railway project, was faced with the predicament of clayshale formations at 7 of the 13 tunnels that were constructed. Along certain segments the chosen tunnel, large deformation occurred on the surface and tunnel f...

Full description

Saved in:
Bibliographic Details
Main Author: Bratanata, Jonathan
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/68390
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia