ANALYSIS OF TUNNEL EXCAVATION THROUGH CLAYSHALE (CASE STUDY: JAKARTA-BANDUNG HIGHSPEED RAILWAY)
Tunnel construction in West Java, more specifically for the Jakarta-Bandung Highspeed Railway project, was faced with the predicament of clayshale formations at 7 of the 13 tunnels that were constructed. Along certain segments the chosen tunnel, large deformation occurred on the surface and tunnel f...
Saved in:
Main Author: | Bratanata, Jonathan |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/68390 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
3 DIMENSIONAL ANALYSIS FOR NATURAL SLOPE STABILITY DUE TO BLASTING ACTIVITIES IN THE 11TH TUNNEL OF JAKARTA-BANDUNG HIGHSPEED RAILWAY
by: Akbar, Fadhilla -
SELECTION BETWEEN 2 FEEDER MODES OF HIGHSPEED RAILWAY JAKARTA-BANDUNG FROM PADALARANG STATION
by: Eka Oktavia, Tyas -
STUDY OF ALTERNATIVE SELECTION OF ROAD RELOCATION DESIGN ( CASE STUDY : RELOCATION OF HEGARMANAH ROAD AND TEGALLAJA ROAD IN JAKARTA BANDUNG HIGHSPEED RAILWAY PROJECT)
by: Majidah, Nurul -
PARAMETRIC STUDY OF RAIL-STRUCTURE INTERACTION ON BALLASTLESS TRACK HIGHSPEED RAILWAY BRIDGE
by: Abdul Ghani, Dwiqhee -
IDENTIFICATION THE IMPACT OF JAKARTA-BANDUNG HIGHSPEED RAIL (KCJB) ON TOURIST VISITS TO THE BRAGA AREA IN BANDUNG CITY
by: Fitriah Shafirah, Nisha