DYNAMIC SIMULATION OF BLASTING GROUND VIBRATION OF TUNNEL #4 JAKARTA-BANDUNG HIGH-SPEED RAILWAY PROJECT

The blasting is the method that commonly used to excavate rock but it also can produce ground vibrations that are detrimental to the surrounding environment. Therefore, analytical research is needed by paying attention to the distance from the center of the explosion, the amount of explosives to be...

Full description

Saved in:
Bibliographic Details
Main Author: Hafid Fahrudinsyah, Muhammad
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/51552
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia