DYNAMIC SIMULATION OF BLASTING GROUND VIBRATION OF TUNNEL #4 JAKARTA-BANDUNG HIGH-SPEED RAILWAY PROJECT
The blasting is the method that commonly used to excavate rock but it also can produce ground vibrations that are detrimental to the surrounding environment. Therefore, analytical research is needed by paying attention to the distance from the center of the explosion, the amount of explosives to be...
Saved in:
Main Author: | Hafid Fahrudinsyah, Muhammad |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/51552 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DYNAMIC SIMULATION OF BLASTING GROUND VIBRATION USING 3 DIMENSIONS AT TUNNEL #11 JAKARTA-BANDUNG HIGH-SPEED RAILWAY PROJECT
by: Muhajir, Afdhal -
SLOPE STABILITY ANALISYS OF JOINTED ROCK DUE TO BLASTING OF THE 4TH TUNNEL OF JAKARTA-BANDUNG HIGH SPEED RAILWAY PROJECT
by: Aditya, Fariz -
ANALYSIS OF VIBRATION EFFECT ON SURFACE BLASTING TOWARDS THE STABILITY OF TUNNEL # 4 THE INDONESIA-CHINA HIGH SPEED RAILWAY PROJECT, PURWAKARTA
by: Maulana, Yuga -
SLOPE STABILITY ANALYSIS CAUSED BY JAKARTA-BANDUNG HIGH-SPEED RAILWAY PROJECT #11 TUNNEL BLASTING OPERATION USING FINITE ELEMENT METHOD
by: Tarigan, Reformes -
EMPIRICAL EQUATION OF BLASTING VIBRATION BASED ON BLASTLOAD EQUIVALENT VALUE â #4 TUNNEL CASE STUDY, JAKARTA-BANDUNG HIGH SPEED RAIL PROJECT
by: Suhardjo, Edwin