TUNNEL MONITORING WITH TOTAL STATION ON NOTOG RAILWAY TUNNEL

In accordance with the work plan of Ministry of Transportation of Republic of Indonesia, a double railway track will be constructed connecting Cirebon City and Kroya Regency. The Notog tunnel is part of the track that is planned to have a length of about 550 m. Tunnel stability is one of important t...

Full description

Saved in:
Bibliographic Details
Main Author: Prima Sudibyo (NIM : 22115009), Surya
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/31151
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia