TUNNEL MONITORING WITH TOTAL STATION ON NOTOG RAILWAY TUNNEL

In accordance with the work plan of Ministry of Transportation of Republic of Indonesia, a double railway track will be constructed connecting Cirebon City and Kroya Regency. The Notog tunnel is part of the track that is planned to have a length of about 550 m. Tunnel stability is one of important t...

Full description

Saved in:
Bibliographic Details
Main Author: Prima Sudibyo (NIM : 22115009), Surya
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/31151
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:31151
spelling id-itb.:311512018-10-01T13:32:10ZTUNNEL MONITORING WITH TOTAL STATION ON NOTOG RAILWAY TUNNEL Prima Sudibyo (NIM : 22115009), Surya Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/31151 In accordance with the work plan of Ministry of Transportation of Republic of Indonesia, a double railway track will be constructed connecting Cirebon City and Kroya Regency. The Notog tunnel is part of the track that is planned to have a length of about 550 m. Tunnel stability is one of important things to be concerned in construction process. Instability will cause operation disruption and potentially cause damage to equipment or even casualties. Therefore, it is necessary to monitor deformation and conduct tunnel stability analysis. <br /> <br /> Tunnel deformation was monitored using Total Station and 30 cm-length pins which installed on roof, left wall, and right wall of tunnel for 15 days. Furthermore, Mohr-Coulomb collapse criteria and plastic characteristics was used in finite element analysis. <br /> <br /> Monitoring results showed that the displacements occur with relative direction to the lower right of the wwith average displacement 5 mm. In numerical modeling, displacement direction is relatively same as monitoring result and Factor of Safety of each points are larger than 1,3 which indicates the tunnel is in stable. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description In accordance with the work plan of Ministry of Transportation of Republic of Indonesia, a double railway track will be constructed connecting Cirebon City and Kroya Regency. The Notog tunnel is part of the track that is planned to have a length of about 550 m. Tunnel stability is one of important things to be concerned in construction process. Instability will cause operation disruption and potentially cause damage to equipment or even casualties. Therefore, it is necessary to monitor deformation and conduct tunnel stability analysis. <br /> <br /> Tunnel deformation was monitored using Total Station and 30 cm-length pins which installed on roof, left wall, and right wall of tunnel for 15 days. Furthermore, Mohr-Coulomb collapse criteria and plastic characteristics was used in finite element analysis. <br /> <br /> Monitoring results showed that the displacements occur with relative direction to the lower right of the wwith average displacement 5 mm. In numerical modeling, displacement direction is relatively same as monitoring result and Factor of Safety of each points are larger than 1,3 which indicates the tunnel is in stable.
format Theses
author Prima Sudibyo (NIM : 22115009), Surya
spellingShingle Prima Sudibyo (NIM : 22115009), Surya
TUNNEL MONITORING WITH TOTAL STATION ON NOTOG RAILWAY TUNNEL
author_facet Prima Sudibyo (NIM : 22115009), Surya
author_sort Prima Sudibyo (NIM : 22115009), Surya
title TUNNEL MONITORING WITH TOTAL STATION ON NOTOG RAILWAY TUNNEL
title_short TUNNEL MONITORING WITH TOTAL STATION ON NOTOG RAILWAY TUNNEL
title_full TUNNEL MONITORING WITH TOTAL STATION ON NOTOG RAILWAY TUNNEL
title_fullStr TUNNEL MONITORING WITH TOTAL STATION ON NOTOG RAILWAY TUNNEL
title_full_unstemmed TUNNEL MONITORING WITH TOTAL STATION ON NOTOG RAILWAY TUNNEL
title_sort tunnel monitoring with total station on notog railway tunnel
url https://digilib.itb.ac.id/gdl/view/31151
_version_ 1822923495024099328