DYNAMIC SIMULATION OF BLASTING GROUND VIBRATION USING 3 DIMENSIONS AT TUNNEL #11 JAKARTA-BANDUNG HIGH-SPEED RAILWAY PROJECT

Excavation using blasting is the method most often used to excavate relatively hard rock. Besides it also can produce ground vibrations that are detrimental to the surrounding environment. This research attempts to simulate the blasting of Tunnel 11 using a blastload and monitoring as validation....

Full description

Saved in:
Bibliographic Details
Main Author: Muhajir, Afdhal
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/61613
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia