DYNAMIC SIMULATION OF BLASTING GROUND VIBRATION USING 3 DIMENSIONS AT TUNNEL #11 JAKARTA-BANDUNG HIGH-SPEED RAILWAY PROJECT
Excavation using blasting is the method most often used to excavate relatively hard rock. Besides it also can produce ground vibrations that are detrimental to the surrounding environment. This research attempts to simulate the blasting of Tunnel 11 using a blastload and monitoring as validation....
Saved in:
Main Author: | Muhajir, Afdhal |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/61613 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DYNAMIC SIMULATION OF BLASTING GROUND VIBRATION OF TUNNEL #4 JAKARTA-BANDUNG HIGH-SPEED RAILWAY PROJECT
by: Hafid Fahrudinsyah, Muhammad -
SLOPE STABILITY ANALYSIS CAUSED BY JAKARTA-BANDUNG HIGH-SPEED RAILWAY PROJECT #11 TUNNEL BLASTING OPERATION USING FINITE ELEMENT METHOD
by: Tarigan, Reformes -
SLOPE STABILITY ANALISYS OF JOINTED ROCK DUE TO BLASTING OF THE 4TH TUNNEL OF JAKARTA-BANDUNG HIGH SPEED RAILWAY PROJECT
by: Aditya, Fariz -
SLOPE STABILITY ANALYSIS OF SOIL AND ROCK AROUND BOHONG MOUNTAIN, PADALARANG DUE TO BLASTING AT TUNNEL #11 HIGH-SPEED RAILWAY JAKARTA - BANDUNG
by: Dwifajar Prabowo, Jerry -
ANALYSIS OF VIBRATION EFFECT ON SURFACE BLASTING TOWARDS THE STABILITY OF TUNNEL # 4 THE INDONESIA-CHINA HIGH SPEED RAILWAY PROJECT, PURWAKARTA
by: Maulana, Yuga