RISK MANAGEMENT ON ACCESS NETWORK DEPLOYMENT âSTTF PROJECTâ (CASE STUDY: PT TELKOM INDONESIA TBK)
The telecommunications industry in Indonesia has grown incredibly rapidly in the last decade, and almost every region already has access to the internet, which is managed by a variety of different internet service providers. PT Telkom Indonesia Tbk, as one of the leading firms operating in the t...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/68446 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | The telecommunications industry in Indonesia has grown incredibly rapidly in the last
decade, and almost every region already has access to the internet, which is managed by a
variety of different internet service providers. PT Telkom Indonesia Tbk, as one of the
leading firms operating in the telecommunications sector in Indonesia, has the largest access
network, extending from Sabang to Merauke. Users of the IndiHome service are growing
annually. As a result, PT Telkom Indonesia Tbk keeps deploying access networks to increase
service coverage and offer the community and its users the best possible service. Because the
access network is a production tool for providing internet services to customers, this access
network deployment activity directly affects PT Telkom Indonesia Tbk's revenue. Generally,
there is a risk of not generating revenue if there are obstacles in the deployment of the access
network. As a result, risk management is essential for this project. This final project was
written using the ISO 31000 framework, which includes a stage for risk assessment in the
form of risk identification, risk analysis, and risk treatment. 19 risk events have been
identified as a result of the risk identification process, and they are divided into four
categories: financial risk, legal risk, environmental risk, and operational risk. Once the risk
events have been identified, a risk analysis is conducted using the Analytical Hierarchy
Process (AHP) method to determine the priorities of the risk events. In the risk treatment, 13
risk events were proposed to be reduced or mitigated, 3 risk events were proposed to be
avoided, 1 risk event was proposed to be transferred, and 2 risk events were proposed to be
accepted.
|
---|