RISK ASSESSMENT ON THE BRIDGE CONSTRUCTION PROJECT (CASE STUDY: BATANG JUJUAN AND BATANG GANEH BRIDGE CONSTRUCTION PROJECTS)

Implementing a bridge construction project in the West Sumatra region will likely create many risks that stakeholders must consider because the impact is detrimental and can affect the overall project completion. In this case, it is necessary to carry out risk analysis, determine risk priorities,...

Full description

Saved in:
Bibliographic Details
Main Author: Zona, Hafizh
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/68466
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:68466
spelling id-itb.:684662022-09-15T13:59:29ZRISK ASSESSMENT ON THE BRIDGE CONSTRUCTION PROJECT (CASE STUDY: BATANG JUJUAN AND BATANG GANEH BRIDGE CONSTRUCTION PROJECTS) Zona, Hafizh Manajemen umum Indonesia Theses risk management, bridge construction project, ISO 31000:2018, analytical hierarchy proces INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/68466 Implementing a bridge construction project in the West Sumatra region will likely create many risks that stakeholders must consider because the impact is detrimental and can affect the overall project completion. In this case, it is necessary to carry out risk analysis, determine risk priorities, and respond to risks concerning ISO 31000:2018. Starting from the first thing, namely knowing for sure the risks that arise from each stakeholder, the second is determining the risk parameters for each risk source using an analytical hierarchy process approach, and the third is knowing the risk response strategy of each stakeholder. To obtain accurate results in analyzing the risks of each stakeholder, several people represent each element of the stakeholders who are considered capable and have adequate knowledge about the risks that will occur during the implementation of bridge construction in the West Sumatra region. Based on the analysis conducted using the analytical hierarchy process method, it can be concluded that the risk factors of each stakeholder are according to the owner, the risk contribution from the economic criteria is the most priority consideration with a weight of 51%, construction criteria of 35% and criteria imposed by legal and contract of 14%. Meanwhile, according to contractors, economic criteria are also dominant with a weight of 60%, construction criteria by 29%, and legal and contract criteria by 11%. The global calculation represented by each stakeholder shows that the risk in economic factors is the dominant risk, which is 52% of the owner's perception and 57% of the contractor's perception. To prevent risks that will arise, each stakeholder has different considerations in determining the level of interest based on the stakeholders' considerations and made following laws, regulations, and other provisions. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Zona, Hafizh
RISK ASSESSMENT ON THE BRIDGE CONSTRUCTION PROJECT (CASE STUDY: BATANG JUJUAN AND BATANG GANEH BRIDGE CONSTRUCTION PROJECTS)
description Implementing a bridge construction project in the West Sumatra region will likely create many risks that stakeholders must consider because the impact is detrimental and can affect the overall project completion. In this case, it is necessary to carry out risk analysis, determine risk priorities, and respond to risks concerning ISO 31000:2018. Starting from the first thing, namely knowing for sure the risks that arise from each stakeholder, the second is determining the risk parameters for each risk source using an analytical hierarchy process approach, and the third is knowing the risk response strategy of each stakeholder. To obtain accurate results in analyzing the risks of each stakeholder, several people represent each element of the stakeholders who are considered capable and have adequate knowledge about the risks that will occur during the implementation of bridge construction in the West Sumatra region. Based on the analysis conducted using the analytical hierarchy process method, it can be concluded that the risk factors of each stakeholder are according to the owner, the risk contribution from the economic criteria is the most priority consideration with a weight of 51%, construction criteria of 35% and criteria imposed by legal and contract of 14%. Meanwhile, according to contractors, economic criteria are also dominant with a weight of 60%, construction criteria by 29%, and legal and contract criteria by 11%. The global calculation represented by each stakeholder shows that the risk in economic factors is the dominant risk, which is 52% of the owner's perception and 57% of the contractor's perception. To prevent risks that will arise, each stakeholder has different considerations in determining the level of interest based on the stakeholders' considerations and made following laws, regulations, and other provisions.
format Theses
author Zona, Hafizh
author_facet Zona, Hafizh
author_sort Zona, Hafizh
title RISK ASSESSMENT ON THE BRIDGE CONSTRUCTION PROJECT (CASE STUDY: BATANG JUJUAN AND BATANG GANEH BRIDGE CONSTRUCTION PROJECTS)
title_short RISK ASSESSMENT ON THE BRIDGE CONSTRUCTION PROJECT (CASE STUDY: BATANG JUJUAN AND BATANG GANEH BRIDGE CONSTRUCTION PROJECTS)
title_full RISK ASSESSMENT ON THE BRIDGE CONSTRUCTION PROJECT (CASE STUDY: BATANG JUJUAN AND BATANG GANEH BRIDGE CONSTRUCTION PROJECTS)
title_fullStr RISK ASSESSMENT ON THE BRIDGE CONSTRUCTION PROJECT (CASE STUDY: BATANG JUJUAN AND BATANG GANEH BRIDGE CONSTRUCTION PROJECTS)
title_full_unstemmed RISK ASSESSMENT ON THE BRIDGE CONSTRUCTION PROJECT (CASE STUDY: BATANG JUJUAN AND BATANG GANEH BRIDGE CONSTRUCTION PROJECTS)
title_sort risk assessment on the bridge construction project (case study: batang jujuan and batang ganeh bridge construction projects)
url https://digilib.itb.ac.id/gdl/view/68466
_version_ 1822933653536112640