RISK ASSESSMENT ON THE BRIDGE CONSTRUCTION PROJECT (CASE STUDY: BATANG JUJUAN AND BATANG GANEH BRIDGE CONSTRUCTION PROJECTS)
Implementing a bridge construction project in the West Sumatra region will likely create many risks that stakeholders must consider because the impact is detrimental and can affect the overall project completion. In this case, it is necessary to carry out risk analysis, determine risk priorities,...
Saved in:
Main Author: | Zona, Hafizh |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/68466 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT PROJECT ANALYSIS OF CONSTRUCTION MAINTENANCE PROJECT (CASE STUDY FOR PT.ABC)
by: Ghoffaar Noorwandi, Abdul -
IDENTIFICATION AND ANALYSIS OF RISK CONSTRUCTION WITH FMEA METHOD ON BUILDING PROJECT AT SURABAYA (CASE STUDY OF PT XYZ)
by: Rayendra, Ridho -
THE RISK STRATEGIES OF RETURNING LAND BAILOUTS IN THE TRANS SUMATRA TOLL ROAD CONSTRUCTION PROJECT (CASE STUDY OF PT HUTAMA KARYA)
by: Dyovenda Zakia, Kevin -
IMPROVING PROJECT SCHEDULE ACCURACY OF MEDIUM SCALE CONSTRUCTION PROJECT THROUGH PERT ANALYSIS.
by: Hidayatullah, Roby -
RISK ASSESSMENT PROJECT CASE STUDY ERP UPGRADE AT PT BADAK NGL
by: Wijaya Perwira, Pandu