INVESTMENT ANALYSIS OF THE CORRUGATED BRIDGE CONSTRUCTION PHASE V IN PIT C2HS JOB SITE SAMBARATA MINE OPERATION PT. BERAU COAL

Pit C2HS is one of the pits in the Sambarata Mine Operation (SMO) which is one of the open mining operational areas owned by PT. Berau Coal. This pit is targeted to produce 5,915,000 MT of coal for 3 years (2023-2025). Currently, mining activities in pit C2HS are constantly shifting which cau...

Full description

Saved in:
Bibliographic Details
Main Author: Yulian, Tommy
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/68465
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia