INVESTMENT ANALYSIS OF THE CORRUGATED BRIDGE CONSTRUCTION PHASE V IN PIT C2HS JOB SITE SAMBARATA MINE OPERATION PT. BERAU COAL
Pit C2HS is one of the pits in the Sambarata Mine Operation (SMO) which is one of the open mining operational areas owned by PT. Berau Coal. This pit is targeted to produce 5,915,000 MT of coal for 3 years (2023-2025). Currently, mining activities in pit C2HS are constantly shifting which cau...
Saved in:
Main Author: | Yulian, Tommy |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/68465 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT ANALYSIS OF LOADPRO X60 AS COAL HAULING EQUIPMENT IN PIT A, SAMBARATA MINE OPERATIONS, PT. BERAU COAL
by: Ramadinata Yantoro, William -
SUSTAINABILITY AND DECISION MAKING COAL TRANSPORTATION AT COAL MINING PIT C2 SAMBARATA MINING OPERATION PT. BERAU COAL
by: Saputro, Arintoko -
PROPOSED STRATEGIC MINE PLANNING AND ECONOMIC VALUATION OF PIT C2H SAMBARATA PT BERAU COAL
by: Budiarto, Arif -
CHARACTERISTICS OF BONE COAL IN MINING AREA OF PT. BERAU COAL BINUNGAN AND SAMBARATA MINING SITE BERAU SUB-BASIN, TARAKAN BASIN, EAST KALIMANTAN
by: DIAN RIFALDI (NIM : 12113074), MIRZA -
INVESTMENT PROJECT ANALYSIS OF DUAL SYSTEM SUPPLY POWER STUDY CASE AT SITE SAMBARATA MINE OPERATION PT BERAU COAL
by: Chandra Syaputra, Dwi