INVESTMENT ANALYSIS OF THE CORRUGATED BRIDGE CONSTRUCTION PHASE V IN PIT C2HS JOB SITE SAMBARATA MINE OPERATION PT. BERAU COAL

Pit C2HS is one of the pits in the Sambarata Mine Operation (SMO) which is one of the open mining operational areas owned by PT. Berau Coal. This pit is targeted to produce 5,915,000 MT of coal for 3 years (2023-2025). Currently, mining activities in pit C2HS are constantly shifting which cau...

Full description

Saved in:
Bibliographic Details
Main Author: Yulian, Tommy
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/68465
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:68465
spelling id-itb.:684652022-09-15T13:52:24ZINVESTMENT ANALYSIS OF THE CORRUGATED BRIDGE CONSTRUCTION PHASE V IN PIT C2HS JOB SITE SAMBARATA MINE OPERATION PT. BERAU COAL Yulian, Tommy Manajemen umum Indonesia Theses Investment Analysis, Hauling Distance, Corrugated Bridge, Capital Budgeting, Risk Analysis INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/68465 Pit C2HS is one of the pits in the Sambarata Mine Operation (SMO) which is one of the open mining operational areas owned by PT. Berau Coal. This pit is targeted to produce 5,915,000 MT of coal for 3 years (2023-2025). Currently, mining activities in pit C2HS are constantly shifting which causes the hauling distance between the front loading and front disposal to become further away, where this will have an impact on increasing operating costs or overall. One of the alternative that can be done to shorten this hauling distance is to build a new access road and construct a new bridge that crosses the Sambarata river. The main factor that needs to be considered is that this project uses and operate in just 2.5 years (2023-2025) considering the mining concession permit granted by the government of the Republic of Indonesia to PT. Berau Coal is only up to 2025, meaning that this investment must be able to generate a return greater than the CAPEX before the contract expires. Therefore, investment decisions must go through a comprehensive analysis of economic parameters so that the decisionmaking process is correct. To measure business conditions, the PESTLE framework is used to determine the influence of external factors on the project and the overall business environment, while the analysis of the company's internal capabilities is carried out by identifying the company's tangible and intangible resources.Capital Budgeting is used to evaluate the financial feasibility of the project, including sensitivity analysis of several economic parameters. It is also carried out to determine what parameters have a significant impact on the project's economic. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Yulian, Tommy
INVESTMENT ANALYSIS OF THE CORRUGATED BRIDGE CONSTRUCTION PHASE V IN PIT C2HS JOB SITE SAMBARATA MINE OPERATION PT. BERAU COAL
description Pit C2HS is one of the pits in the Sambarata Mine Operation (SMO) which is one of the open mining operational areas owned by PT. Berau Coal. This pit is targeted to produce 5,915,000 MT of coal for 3 years (2023-2025). Currently, mining activities in pit C2HS are constantly shifting which causes the hauling distance between the front loading and front disposal to become further away, where this will have an impact on increasing operating costs or overall. One of the alternative that can be done to shorten this hauling distance is to build a new access road and construct a new bridge that crosses the Sambarata river. The main factor that needs to be considered is that this project uses and operate in just 2.5 years (2023-2025) considering the mining concession permit granted by the government of the Republic of Indonesia to PT. Berau Coal is only up to 2025, meaning that this investment must be able to generate a return greater than the CAPEX before the contract expires. Therefore, investment decisions must go through a comprehensive analysis of economic parameters so that the decisionmaking process is correct. To measure business conditions, the PESTLE framework is used to determine the influence of external factors on the project and the overall business environment, while the analysis of the company's internal capabilities is carried out by identifying the company's tangible and intangible resources.Capital Budgeting is used to evaluate the financial feasibility of the project, including sensitivity analysis of several economic parameters. It is also carried out to determine what parameters have a significant impact on the project's economic.
format Theses
author Yulian, Tommy
author_facet Yulian, Tommy
author_sort Yulian, Tommy
title INVESTMENT ANALYSIS OF THE CORRUGATED BRIDGE CONSTRUCTION PHASE V IN PIT C2HS JOB SITE SAMBARATA MINE OPERATION PT. BERAU COAL
title_short INVESTMENT ANALYSIS OF THE CORRUGATED BRIDGE CONSTRUCTION PHASE V IN PIT C2HS JOB SITE SAMBARATA MINE OPERATION PT. BERAU COAL
title_full INVESTMENT ANALYSIS OF THE CORRUGATED BRIDGE CONSTRUCTION PHASE V IN PIT C2HS JOB SITE SAMBARATA MINE OPERATION PT. BERAU COAL
title_fullStr INVESTMENT ANALYSIS OF THE CORRUGATED BRIDGE CONSTRUCTION PHASE V IN PIT C2HS JOB SITE SAMBARATA MINE OPERATION PT. BERAU COAL
title_full_unstemmed INVESTMENT ANALYSIS OF THE CORRUGATED BRIDGE CONSTRUCTION PHASE V IN PIT C2HS JOB SITE SAMBARATA MINE OPERATION PT. BERAU COAL
title_sort investment analysis of the corrugated bridge construction phase v in pit c2hs job site sambarata mine operation pt. berau coal
url https://digilib.itb.ac.id/gdl/view/68465
_version_ 1822933653271871488