PERANCANGAN SISTEM PEMANTAUAN EKSEKUSI PRODUKSI SECARA REAL-TIME PADA DIVISI DETAIL PART MANUFACTURING DI PT DIRGANTARA INDONESIA

PT Dirgantara Indonesia (DI) is a company engaged in the aircraft manufacturing industry. The production planning and execution process from PT DI is regulated by a production division called Detail Part Manufacturing (DPM). The realization of scheduling on the production floor of the DPM division t...

Full description

Saved in:
Bibliographic Details
Main Author: Ai
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/68797
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:68797
spelling id-itb.:687972022-09-19T10:32:08ZPERANCANGAN SISTEM PEMANTAUAN EKSEKUSI PRODUKSI SECARA REAL-TIME PADA DIVISI DETAIL PART MANUFACTURING DI PT DIRGANTARA INDONESIA Ai Indonesia Final Project monitoring system design, information flow, scheduling method INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/68797 PT Dirgantara Indonesia (DI) is a company engaged in the aircraft manufacturing industry. The production planning and execution process from PT DI is regulated by a production division called Detail Part Manufacturing (DPM). The realization of scheduling on the production floor of the DPM division tends to be low and the SAP system used cannot collect canceled order scheduling information, thus hampering the coordination and monitoring process. Therefore, the production floor in the DPM division requires a system that can smooth the flow of information during production activities and requires the proposed new scheduling method to improve the current method. The completion of this research was carried out by designing a real-time production execution monitoring system and selecting a new scheduling method. The scope of the monitoring system design is only carried out until the prototype form, so that the design steps are, identification of needs, design of monitoring system design, and testing. Meanwhile, the selection of the scheduling method is done by combining the new method with the priority criteria that have been used so far. The result of this design is a monitoring system that can be accessed on the Google Sheet web. The design of this monitoring system accommodates the flow of feedback information in real time, both vertically and horizontally between parties responsible for production execution. Meanwhile, the proposed scheduling method is the WSPT (Weighted Shortest Processing Time) method whose weights use the priority criteria for delivery date, sequence assembly, and return status of orders. The implementation of this solution is expected to improve the coordination, monitoring, and scheduling processes in the DPM division so as to produce performance efficiency in the production system. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Dirgantara Indonesia (DI) is a company engaged in the aircraft manufacturing industry. The production planning and execution process from PT DI is regulated by a production division called Detail Part Manufacturing (DPM). The realization of scheduling on the production floor of the DPM division tends to be low and the SAP system used cannot collect canceled order scheduling information, thus hampering the coordination and monitoring process. Therefore, the production floor in the DPM division requires a system that can smooth the flow of information during production activities and requires the proposed new scheduling method to improve the current method. The completion of this research was carried out by designing a real-time production execution monitoring system and selecting a new scheduling method. The scope of the monitoring system design is only carried out until the prototype form, so that the design steps are, identification of needs, design of monitoring system design, and testing. Meanwhile, the selection of the scheduling method is done by combining the new method with the priority criteria that have been used so far. The result of this design is a monitoring system that can be accessed on the Google Sheet web. The design of this monitoring system accommodates the flow of feedback information in real time, both vertically and horizontally between parties responsible for production execution. Meanwhile, the proposed scheduling method is the WSPT (Weighted Shortest Processing Time) method whose weights use the priority criteria for delivery date, sequence assembly, and return status of orders. The implementation of this solution is expected to improve the coordination, monitoring, and scheduling processes in the DPM division so as to produce performance efficiency in the production system.
format Final Project
author Ai
spellingShingle Ai
PERANCANGAN SISTEM PEMANTAUAN EKSEKUSI PRODUKSI SECARA REAL-TIME PADA DIVISI DETAIL PART MANUFACTURING DI PT DIRGANTARA INDONESIA
author_facet Ai
author_sort Ai
title PERANCANGAN SISTEM PEMANTAUAN EKSEKUSI PRODUKSI SECARA REAL-TIME PADA DIVISI DETAIL PART MANUFACTURING DI PT DIRGANTARA INDONESIA
title_short PERANCANGAN SISTEM PEMANTAUAN EKSEKUSI PRODUKSI SECARA REAL-TIME PADA DIVISI DETAIL PART MANUFACTURING DI PT DIRGANTARA INDONESIA
title_full PERANCANGAN SISTEM PEMANTAUAN EKSEKUSI PRODUKSI SECARA REAL-TIME PADA DIVISI DETAIL PART MANUFACTURING DI PT DIRGANTARA INDONESIA
title_fullStr PERANCANGAN SISTEM PEMANTAUAN EKSEKUSI PRODUKSI SECARA REAL-TIME PADA DIVISI DETAIL PART MANUFACTURING DI PT DIRGANTARA INDONESIA
title_full_unstemmed PERANCANGAN SISTEM PEMANTAUAN EKSEKUSI PRODUKSI SECARA REAL-TIME PADA DIVISI DETAIL PART MANUFACTURING DI PT DIRGANTARA INDONESIA
title_sort perancangan sistem pemantauan eksekusi produksi secara real-time pada divisi detail part manufacturing di pt dirgantara indonesia
url https://digilib.itb.ac.id/gdl/view/68797
_version_ 1822933753782075392